Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED <br /> Jodie C.A. Tsubone,P.E. Senior Civil Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 13 10 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC, (Aiea,Hawaii) <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering,University of Hawaii at Manoa Registered Professional Engineer,HI -Civil No. 17048 <br /> Certified Asbestos Inspector, HIASB-4629 <br /> Certified Lead Risk Assessor, PB-1151 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training <br /> OSHA 8-hour HAZWOPER Refresher Training for Contractors <br /> OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training <br /> Maritime Security Awareness Training(MARSEC) Confined Space Training <br /> Erosion and Sediment Control Plan Coordinator (ESCP) Bloodborne Pathogens, First Aid, CPR,and AED Training <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lead in Drinking Water Testing at Priority Areas JBPHH PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> and Naval Computer and Telecommunications Area 2020 - <br /> Master Station Pacific JBPHH and NCTAMS Pacific, <br /> Wahiawa,Oahu,Hawaii <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Conducted drinking water testing for lead as a protective measure at several priority areas and various schools <br /> a. and childcare facilities on Navy Installations. Quick turnaround times were required for sampling, laboratory <br /> analysis, and notifications. Initial site investigations were conducted to develop a comprehensive two-step <br /> sampling plan, in accordance with updated Navy directives and EPA guidance. Fieldwork involved multiple <br /> visits to each facility to prepare and sample over 700 drinking water outlets, conducted during evenings and <br /> weekends to minimize the impact on facility operations. Upon completion of the two-step sampling process, <br /> corrective actions were immediately developed and provided to the Navy. A Project Summary Report <br /> documented all work and findings. Fee: $99,595. Role: Project Manager/Senior Civil Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Reconstruction/Replacement of Sewers, Ho'omaluhia PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Botanical Gardens,Kaneohe,Oahu,Hawaii 2025 2025 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> E2 completed the planning and preliminary design for the reconstruction/replacement of existing sewer lines at <br /> b. the Ho`omaluhia Botanical Gardens. The first phase was completed and included cleaning and CCTV inspection <br /> of the entire 2-mile gravity sewer system in accordance with the Pipeline Assessment Certification Program. <br /> Assessed the sewer line deficiencies from the CCTV data, developed rehabilitation/replacement alternatives for <br /> the system, prepared schematic and concept drawings for the recommended alternatives, and prepared a cost <br /> estimate for the recommended improvements. E2 prepared construction documents for Phase III. Size: 2 miles. <br /> Fee: $165,000. Role: Senior Civil Engineer. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Ozone-Depleting Substances (ODS) Inventory and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Management Plan for Naval Air Facility Atsugi (NAFA), 2017 - <br /> Atsugi,Japan <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> C. E2 updated the air source inventory to include all ODS containing units regulated or potentially regulated by the <br /> Japan Environmental Governing Standard (JEGS) and air emission sources (except ODS) that are regulated by <br /> the JEGS. Fieldwork for the project included verification of over 2,400 refrigerant and air emission sources at <br /> over 160 facilities. Responsibilities included: preparation of the Work Plan, completion of field inspections, <br /> preparation of the updated database inventory, and quality assurance review of the updated Refrigerant <br /> Management Plan. Fee: $199,000.Role: Senior Civil Engineer. <br /> ELEMENT ENVIRONMENTAL,LLC COUNTY OF HAWAII, PAGE 11 <br />