E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Candace K.Yamauchi,P.E. Senior Environmental Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 20 14
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC, (Aiea,Hawaii)
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Earth and Environmental Engineering, Registered Professional Engineer,HI -Civil No. 16320
<br /> Columbia University Certified Asbestos Inspector, HIASB-3840
<br /> Certified Lead Risk Assessor, PB-1135
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness
<br /> OSHA 8-hour HAZWOPER Refresher Training Training for Contractors
<br /> OSHA 30-hour Construction Safety and Health Training Confined Space Training
<br /> Qualified Stormwater Compliance Manager Hazardous Waste Site Supervisor Training
<br /> Bloodborne Pathogens, First Aid, CPR,and AED Training
<br /> 18.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Illicit Discharge Survey,Commander Navy Region Hawaii, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> JBPHH,Oahu,Hawaii 2016 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> a. Completed an illicit discharge survey for non-stormwater discharges to the CNRH's municipal separate storm
<br /> sewer system (MS4) and waters of the U.S. in accordance with the NPDES permit issued. Inspected over 1,300
<br /> facilities, developed recommendations for corrections, and prepared the associated preliminary cost
<br /> estimates. Fee: $393,019. Role: Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kaneohe Bay No.2 Wastewater Pump Station Force Main PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Improvements, Kaneohe,Oahu,Hawaii 2017 2018
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Design alternatives analysis for the replacement of the existing 14-inch force main.Alternatives analyzed
<br /> b. included horizontal directional drilling, pilot tube microtunneling, and open-cut trenching the new alignment
<br /> across an existing waterway. Completed design drawings and specifications for the selected alternative,
<br /> horizontal directional drilling. Prepared the Engineering Design Alternatives Report, completed design
<br /> calculations for the pumps and force main design, prepared design drawings and specifications, and other
<br /> necessary permit documents. Fee: $520,000. Role: Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waimanalo Wastewater Treatment Plant Effluent Reuse PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Feasibility Study,Waimanalo,Oahu,Hawaii 2014 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Conducted a study to assess the technical, environmental, and economic feasibility of wastewater effluent
<br /> C. reuse from the Waimanalo Wastewater Treatment Plant. Responsible for the identification of potential users
<br /> and locations, including the reuse demand, and transmission and storage requirements.Tasks included public
<br /> outreach, data collection, research of prior studies, and evaluation of costs. Prepared a conceptual layout and
<br /> cost estimate for the preferred WWTP upgrades and transmission and storage requirements for users with
<br /> strong interest in reuse. Fee: $219,345. Role: Senior Environmental Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Storm Water Management Plan,Commander Navy Region PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Hawaii,JBPHH,Oahu,Hawaii 2016 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 prepared a SWMP for the Navy Region Hawaii in accordance with their NPDES permit. The SWMP
<br /> d. contained several program components including public education and outreach; illicit discharge detection
<br /> and elimination; construction site runoff control; post-construction stormwater management; P2 and good
<br /> housekeeping; stormwater monitoring; and reporting. Developed Stormwater Pollution Control Plans
<br /> (SWPCPs) for 25 industrial facilities. Responsibilities included conducting facility inspections and interviews,
<br /> coordination with client and facility managers, and preparing the document for submittal. Fee: $291,000.
<br /> Role: Senior Environmental Engineer.
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> ELEMENT ENVIRONMENTAL,LLC COUNTY OF HAWAII, PAGE 12
<br />
|