Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.ROLE IN THIS CONTRACT 13.YEARS EXPERIENCE <br /> John A. Ellis Project Environmental Scientist a.TOTAL b.WITH CURRENT FIRM <br /> 10 10 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC (Aiea,Hawaii) <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Undergraduate Work, Natural Sciences, Oregon Certified Asbestos Inspector, HIASB-4117 <br /> State University Certified Lead Risk Assessor, PB-0828 <br /> Radon Measurement Professional NRPP ID 115201-RMP <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> OSHA 40-hour HAZWOPER Training 40-HR Construction Safety Hazardous Awareness Training <br /> OSHA 8-hour HAZWOPER Refresher Training for Contractors <br /> Confined Space Training Bloodborne Pathogens, First Aid, CPR and AED Training <br /> 18.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Phase I Environmental Site Assessment,Waiawa,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION <br /> 2016 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> E2 completed a Phase I ESA to evaluate potential environmental issues as part of due diligence to support the <br /> a. acquisition of easements on non-Department of Defense (DoD) land, required for the replacement of the U.S. <br /> Navy's Waiawa Water Transmission Main. Responsibilities included integration of over 99 subjects and <br /> adjacent property parcel boundaries on engineering drawings and aerial photos in preparation for the visual <br /> site inspection (VSI); coordination and interviews with property owners and occupants; conducted the VSI <br /> and subsequent follow-up spot inspections and assisted with data management and evaluation and report <br /> preparation. Fee: $105K. Role: Project Environmental Scientist. <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Asbestos and Lead Paint Survey for Singapore Area Coordinator, PROFESSIONAL SERVICES CONSTRUCTION <br /> Sembawang,Singapore 2024 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> b. E2 conducted an asbestos-containing material (ACM) survey and lead-based paint (LBP) inspection including <br /> an LBP risk assessment(LRA) of deteriorated paint and bare soil at unaccompanied housing facilities and lead <br /> dust at lodging units in Sembawang, Singapore. Responsibilities included sampling for ACM and LBP, <br /> thoroughly documenting all fieldwork activities with notes and photography, and preparing computer-aided <br /> design(CAD) drawings. Fee: $1,858,355.Role: Project Environmental Scientist. <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Operation and Maintenance and Monitoring for Multiple Sites, PROFESSIONAL SERVICES CONSTRUCTION <br /> JBPHH,Oahu,Hawaii 2013-2024 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> E2 completed four years of Operation & Maintenance/Monitoring of oily waste collection and treatment <br /> facilities within the Pearl Harbor Naval Shipyard. E2 managed hazardous and oily waste recovered from two <br /> c. product recovery systems installed at the Building 8 and Oscar 2 Pier former release sites. The Building 8 <br /> system included three Fuel Oil Skimmer System (FOSS) units, while the Oscar 2 Pier consisted of five FOSS <br /> units. E2 conducted weekly, monthly, and quarterly inspections and maintenance in order to keep both <br /> product recovery systems operating efficiently. Mr. Ellis' responsibilities included system troubleshooting and <br /> repairs, oily product gauging of over 100 wells, fuel profile sampling, National Pollutant Discharge Elimination <br /> System permit compliance sampling, disposal of recovered product, and draft report preparation. Fee: $431K. <br /> Role: Project Environmental Scientist. <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Storm Water Monitoring&Reporting for Pearl Harbor Naval PROFESSIONAL SERVICES CONSTRUCTION <br /> Shipyard and Intermediate Maintenance Facility,Oahu,Hawaii 2019 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> E2 conducted stormwater monitoring within the Pearl Harbor Naval Shipyard & Intermediate Maintenance <br /> d• Facility within the Controlled Industrial Area Dry Dock area for NPDES compliance. Collected stormwater <br /> samples, submitted samples to the laboratory for analysis, and provided maintenance of the sampling <br /> equipment throughout the project. Prepared report for each sampling event that included the date, time, <br /> duration, and volume of the event; chain of custody; and laboratory results. Fee: $249K. Role: Project <br /> Environmental Scientist. <br /> ELEMENT ENVIRONMENTAL,LLC COUNTY OF HAWAII, PAGE 15 <br />