|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Arnold David West Project Environmental Scientist a.TOTAL b.WITH CURRENT FIRM
<br /> 8 8
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC, (Aiea,Hawaii)
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S.,Applied Physics,Jacksonville University, Florida Certified Asbestos Inspector, HIASB-4625
<br /> Certified Lead Risk Assessor, P-008520
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness Training for
<br /> OSHA 8-hour HAZWOPER Refresher Training Contractors
<br /> Bloodborne Pathogens, First Aid, CPR,and AED Training
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> County of Maui Construction&Demolition Landfill PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Waste Profiling, Maui,Hawaii Ongoing -
<br /> a.
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Prepared and approved waste profiles for Construction & Demolition (C&D) at County of Maui Landfills. Fee:
<br /> $231,260. Role: Project Environmental Scientist.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Asbestos Survey,Naval Base Guam, Guam PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2020 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Completed an asbestos survey of 109 buildings with a total survey area of 1,014,904 square feet at NBG for the
<br /> b. NAVFAC Pacific. E2 prepared a Work Plan (WP) and Health and Safety Plan (HSP) prior to field work. A total of
<br /> 7,134 bulk samples were collected by a team of 4 inspectors, over four mobilizations within a year. E2 prepared
<br /> Draft and Final survey reports that included a summary tables of findings, plans with approximate locations of
<br /> samples taken, extent of most HAs, a closeup and panoramic photo log of samples, and laboratory reports.
<br /> Responsibilities included preparation of the WP and HSP, coordination of fieldwork, fieldwork, and preparation
<br /> the Draft and Final Survey Reports. Fee: $1,065,234.Role: Project Environmental Scientist/Inspector.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Asbestos Survey,Commander Fleet Activities Yokosuka, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Japan 2020 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> C. Conducted an asbestos survey of over 100 buildings with a total area of 2,139,464 square feet and constructed
<br /> between 1914 and 1970 at CFAY, Japan for the NAVFAC Pacific. E2 prepared a Work Plan (WP) and Health and
<br /> Safety Plan (HSP) prior to field work. Responsibilities include sampling for asbestos and lead, thoroughly
<br /> documenting all fieldwork activities with notes and photographs, and preparing report summary tables and
<br /> computer-aided design (CAD) figures. Fee: $999,976. Role: Project Environmental Scientist/Inspector.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Asbestos Survey,U.S. Naval Hospital,Yokosuka,Japan PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2020 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Conducted asbestos surveys of U.S. Navy Hospital Buildings 1400 (the Hospital) and Building 3201
<br /> d. (Management Information) for the NAVFAC Pacific. E2 prepared a draft survey report, which included an ACM
<br /> inventory, summary tables of findings, floor plans with approximate locations of samples taken, asbestos status,
<br /> a closeup and panoramic photo log of samples, and laboratory reports. E2 is currently preparing the final
<br /> survey report. As a benefit to the Navy, E2 is also preparing interactive PDF files that presents the ACM
<br /> inventory when a specific room in the Hospital is selected. Fee: $268,039. Role: Project Environmental
<br /> Scientist/Inspector.
<br /> ELEMENT ENVIRONMENTAL,LLC COUNTY OF HAWAII, PAGE 18
<br />
|