|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.ROLE IN THIS CONTRACT 13.YEARS EXPERIENCE
<br /> Joshua B.Agpaoa, E.I.T. Project Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 7 7
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC (Aiea,Hawaii)
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering,University of Hawaii at Manoa Engineer-in-Training,HI (E.I.T.)
<br /> Certified Asbestos Inspector, HIASB-4791
<br /> Certified Lead Risk Assessor, PB-1137
<br /> Certified SP001 Inspector,AST-7376
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA 40-hour HAZWOPER Training 40-hour Construction Safety Hazard Awareness
<br /> OSHA 8-hour HAZWOPER Refresher Training Training for Contractors
<br /> Bloodborne Pathogens, First Aid, CPR and AED Training
<br /> 18.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Non-Domestic Wastewater Management Plan,JBPHH,Oahu, PROFESSIONAL SERVICES CONSTRUCTION
<br /> Hawaii 2024 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 evaluated NAVFAC Hawaii's 8,000+ facilities to identify, characterize, and quantify non-domestic
<br /> wastewater discharges to the sanitary sewer system tributary to the NAVFAC Hawaii Wastewater Treatment
<br /> a. Plant (WWTP). Coordinated site visits to and conducted interviews with facility managers of over 750
<br /> facilities. The inventory of non-domestic wastewater sources collected in this study will be used to determine
<br /> additional non-domestic discharges that should be internally permitted and regulated. The project also
<br /> includes quarterly wastewater sampling efforts to collect both grab and 24-hour composite samples from
<br /> WWTP influent locations on the Hickam Field flight line and Pearl Harbor, as well as effluent samples from the
<br /> WWTP.Fee: $1,154,918. Role: Project Civil Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Biosolids Handling and Disposal Plan,Pacific Missile Range PROFESSIONAL SERVICES CONSTRUCTION
<br /> Facilities,Wastewater Treatment Plant,Kauai 2024 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 conducted a site investigation and sampling at the Pacific Missile Range Facility (PMRF), Kekaha, Kauai,
<br /> b. Hawaii. The study included various components of the wastewater treatment systems throughout the Base,
<br /> with a focus on the existing wastewater treatment plant (WWTP), individual wastewater system (IWS)
<br /> facilities, sludge drying beds, and the wastewater oxidation pond (WOP). E2 evaluated the current biosolids
<br /> handling practices and will develop a long-term plan for the proper treatment and disposal of biosolids at
<br /> PMRF, including IWS septage,WWTP and WOP sludge. Fee: $128,895. Role: Project Civil Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Facilities Assessment Study East Kauai Irrigation System,Kapaa, PROFESSIONAL SERVICES CONSTRUCTION
<br /> Kauai,Hawaii 2024 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> E2 completed a facilities assessment of the East Kauai Irrigation System for the Department of Agriculture. E2
<br /> d. assessed source waters, ownership, legal rights, and liabilities. E2 completed an inventory and physical
<br /> condition assessment of the irrigation system. E2 conducted site visits to map systems and points of concern.
<br /> E2 prepared repair and maintenance cost estimates. All inventory data collected during this project was
<br /> assembled into various GIS layers and will facilitate dissemination of the collected data to the State client. Fee:
<br /> $537,505. Role: Project Civil Engineer.
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Spill Prevention and Response Plan for Marine Corps Base Butler PROFESSIONAL SERVICES CONSTRUCTION
<br /> Okinawa,Japan 2024 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with the current firm
<br /> E2 completed a SPRP for Marine Corps Base Butler in Okinawa, comprised of 12 sites including Ie Shima
<br /> e• Island. E2 inspected and documented 324 above storage tanks (ASTs), 29 underground storage tanks (USTs),
<br /> 23 chemical storage tanks, and 681 electrical transformers. E2 safely completed the field effort in one visit
<br /> with a variety of personnel over a four-week period during the height of COVID-19. E2 documented each tank
<br /> with inspection checklist, photo, conditions of tanks, BMPs, and recommendations to mitigate unsatisfactory
<br /> conditions. Fee: $340,216. Role: Project Civil Engineer.
<br /> ELEMENT ENVIRONMENTAL,LLC COUNTY OF HAWAII, PAGE 19
<br />
|