Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE THE FIRM'S QUALIFICATIONS FOR THIS PROJECT CATEGORY <br /> 19.TITLE AND LOCATION (City and State) 20.YEAR COMPLETED <br /> Large Capacity Cesspool Statewide Audit for the State of PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Hawaii-Oahu,Maui,Molokai,Kauai,Hawaii Island, <br /> 2023-Ongoing N/A <br /> Hawaii <br /> detailed recommended corrective actions, cost estimates for those actions, and a schedule of completion <br /> that complies with the CA/FO. Finally, individual site reports that document the absence of an LCC for the <br /> remaining thirty(30) subject leases were included. <br /> ➢ Phase II - Islands of Kauai, Maui,and Molokai: "EPA Docket No. UIC-09-2022 -006 Inspection Completion <br /> Report - Phase II (Kauai/Maui/Molokai)" dated February 2024 was submitted to the EPA. Thirty (30) <br /> subject leases were evaluated, some of which were comprised of multiple TMKs. Twenty (20) of the leases <br /> were on Kauai and ten (10) were on Maui.Three (3) of the Maui properties were located in the August 8-9, <br /> 2023 fire-impacted Lahaina area and, per EPA"Approval of Extension to Complete Phase II) dated October <br /> 13, 2023, submittal of inspection reports for these properties will be submitted by the extension deadline <br /> April 19, 2024. Therefore, of the thirty (30) subject leases evaluated, twenty-seven (27) leases are <br /> evaluated in the February 20204 report. Of those leases surveyed, three (3) were found to have LCCs. For <br /> two (2) of those properties with LCCs, the construction and installation of an Individual Wastewater <br /> System (IWS) was recommended. For one (1) property, the recommendation was to connect to the nearby <br /> existing sewer system. A general schedule for corrective actions was presented. Individual site reports for <br /> properties with an LCC were included, each of which provided details on recommended corrective actions, <br /> cost estimates for those actions, and a schedule of completion that complies with the CA/FO. Finally, <br /> individual site reports that document the absence of an LCC for the remaining twenty-three (23) subject <br /> leases were included. <br /> ➢ Phase Ila - Lahaina, Maui: "EPA Docket No. UIC-09-2022-006 Inspection Completion Report - Phase Ha <br /> (Lahaina, Maui)" was completed in April 2024. Three (3) subject leases were evaluated in Lahaina, Maui. <br /> These properties are located in the fire-impacted Lahaina area and, per EPA "Approval of Extension to <br /> Complete Phase II" dated October 13, 2023, submittal of inspection reports for these properties are being <br /> submitted in Phase Ila by the extension deadline of April 19, 2024. This report detailed the findings from <br /> those three (3) properties. Of those leases surveyed, two (2) were found to have LCCs. For the two (2) <br /> properties with LCCs, the construction and installation of an Individual Wastewater System (IWS) was <br /> recommended. A general schedule for corrective actions was presented. Individual site reports for <br /> properties with an LCC were included, each of which included details on recommended corrective actions, <br /> cost estimates for those actions, and a schedule of completion that complies with the CA/FO. Finally, <br /> individual site reports that documented the absence of an LCC for the remaining one (1) subject lease was <br /> included. <br /> ➢ Phase III - Hawaii Island: E2 has completed the inspection validation fieldwork for 58 sites on Hawaii <br /> Island and is currently drafting the finalized Inspection Completion Report. The final report is expected to <br /> be submitted in 2025 to the DLNR and EPA. <br /> E2 will prepare closure reports for the LCCs that are closed by the tenants and DLNR. The closure reports will <br /> document that the LCCs were properly closed in accordance with EPA and DOH requirements. E2 will certify and <br /> sign each independent LCC closure report incorporating DOH permits to operate an IWS or approval to connect to <br /> a sewer, and copies of the EPA LCC Backfilling Final Completion Report or approved copy of the DOH UIC <br /> abandonment application. <br /> Cost: $1M. <br /> 23.FIRMS INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE <br /> a' Element Environmental, LLC Aiea,HI Prime Contractor <br /> ELEMENT ENVIRONMENTAL,LLC COUNTY OF HAWAII, PAGE 24 <br />