Laserfiche WebLink
HHF PLANNERS <br /> County of Hawai'i places for peop(e <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waiawa Water Transmission Main Replacement EA PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, Hawai'i n/a <br /> 2017 <br /> d. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑X Check if project performed with current firm <br /> Project Manager/principal author of NEPA EA for replacement of Navy's primary potable water transmission main serving Joint <br /> Base Pearl Harbor-Hickam. Ms. Renard prepared the CZMA Consistency Determination and EO 11988 Floodplain Management <br /> compliance materials.The project required extensive support of and coordination with NAVFAC Pacific and State and County <br /> agencies to determine whether an HRS,Chapter 343-compliant EA would be required. HHF also supported the project's NHPA <br /> Section 106 consultation and prepared a Cultural Impact Assessment for the action. Project Cost: $167K <br /> Project Cost:$365K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kewalo Basin Improvements EIS/SMA Permit/Conservation District Use Permit CONSTRUCTION(If applicable) <br /> Honolulu, Hawai'i PROFESSIONAL SERVICES n/a <br /> 2017 <br /> e. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm <br /> Project manager/principal author of an HRS Chapter 343 EIS,State Special Management Permit,and Conservation District Use <br /> Permit for a range of improvements to the 22-acre Kewalo Basin. Ultimately,the project involved reconstructing 179 slips and <br /> adding 35 new slips to the harbor.The project included upgrades for water, electrical power, and wastewater systems. Ms. <br /> Renard managed studies on water quality, marine biology,archaeology,cultural impacts, historic resources,traffic,and marine <br /> acoustics. <br /> Project Cost:$365K <br />