Laserfiche WebLink
HHF PLANNERS <br /> County of Hawai'i places for peopfe <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> 12. NAME 13. ROLE IN THIS CONTRACT '-II 14. YEARS EXPERIENCE <br /> a.TOTAL b.WITH CURRENT <br /> 'J 8 FIRM <br /> Gail Renard Project 9 P ect Manager <br /> LEED AP 35 35 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Helber Hastert&Fee, Planners, Inc. DBA HHF Planners, Honolulu, Hawai'i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> ► BA/International Relations <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> `merican Planning Association, Hawai'i Chapter <br /> US Green Building Council <br /> RELEVANT EXPERTISE <br /> ► 30+ years of experience managing and preparing a wide range of land use entitlement and <br /> environmental planning projects in all counties of Hawai'i and across the Pacific Region <br /> ► Managed and prepared 15+ NEPA EIS/EA documents and 11+ HEPA EIS/EAs including the Koa Ridge Ma <br /> kai-Waiawa Development EIS, one of the most high-profile environmental projects on O'ahu in the past <br /> two decades <br /> 19.RELEVANT PROJECTS <br /> 11)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hawai'i State Capitol Reflecting Pools Improvement Project EA PROFESSIONAL SERVICES CONSTRUCTION(If <br /> Honolulu, O`ahu 2024 applicable) <br /> ongoing <br /> a. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm <br /> Project manager of an HRS 343 EA for the replacement of the State Capitol reflecting pools with glass pavers representing the <br /> Pacific Ocean to provide a long-term solution to chronic leakage and maintenance problems caused by the water-filled pools. <br /> Because the Capitol building is a contributing property to the Hawai'i Capital Historic District,the EA thoroughly addressed key <br /> historic preservation and visual impacts of the project.Working closely with the design team and proposing agency, HHF <br /> successfully addressed concerns about the project raised by the public and historic preservation advocates. <br /> Project Cost: $130K <br /> 11)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Underwater Electromagnetic Measurement System EA PROFESSIONAL SERVICES CONSTRUCTION(If <br /> Apra Harbor, Guam 2022 applicable) <br /> n/a <br /> b. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm <br /> Project Manager/principal author of NEPA EA for the installation of an array of electromagnetic sensors and data transmission <br /> cable on the seafloor at U.S. Naval Base Guam to measure the electromagnetic signatures of U.S. Navy ships and submarines to <br /> determine the vessels'susceptibility to adversaries'sea mines and other threat systems.The project required ESA Section 7, EFH <br /> Assessment,CZMA Consistency Determination consultations due to dredging and other impacts on benthic and nearshore <br /> marine habitats. Ms. Renard provided responsive management of the EA that met client deadlines despite mid-stream project <br /> changes.The project earned"Exceptional"ratings from the U.S. Navy for quality, management,schedule,and cost control. <br /> Project Cost: $214K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Harm Harbor Pier Deck Removal EIS PROFESSIONAL SERVICES CONSTRUCTION(If <br /> Hana, Maui 2018 applicable) <br /> n/a <br /> c <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm <br /> Project manager/principal author for an HRS 343 EIS for Hawai'i Department of Transportation, Harbors Division to remove the <br /> superstructure of and access trestle the 90+year old Hana Pier.The pier was assessed to be beyond repair, and HDOT <br /> condemned it due to its deteriorated condition that could pose a risk to public safety. Ms. Renard managed multiple technical <br /> studies and services, including biological and noise impacts, marine biological resources and fisheries,cultural impacts,and <br /> community engagement and public meetings. <br /> Project Cost:$601 K <br />