|
Hawai'i Department Transportation =% HHF PLANNERS
<br /> P P places for people
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> II I�
<br /> a.TOTAL b.WITH CURRENT
<br /> .„ , FIRM
<br /> `.111 ► Dane Sjoblom Principal / Project Manager
<br /> I AICP 16 15
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Helber Hastert&Fee, Planners, Inc. DBA HHF Planners, Honolulu, Hawai'i
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> / MA/Urban and Regional Planning
<br /> / BA/Cultural Anthropology
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> / American Planning Association, Hawai'i Chapter
<br /> / American Institute of Certified Planners
<br /> / National Charrette Institute Charrette Mana.ement and Facilitation Certification
<br /> RELEVANT EXPERTISE
<br /> / Over 15 years of experience in community and land use planning across Hawaii and the Pacific region,
<br /> including Guam, CNMI, American Samoa, and the US Virgin Islands.
<br /> / Certified in Community Planning for Disaster Recovery and Resilient Building Design for Coastal
<br /> Communities, with a career focus on advancing community resilience.
<br /> / Extensive expertise in developing and managing inclusive, effective in-person and virtual community
<br /> engagement programs.
<br /> 19.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Thematic Analysis of Challenges and Opportunities for Mutual Benefit PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> State-wide,Hawai'i 2025 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑X Check if project performed with current firm
<br /> For the Hawai'i State Office of Planning and Sustainable Development, HHF conducted a deductive analysis of Military,State,
<br /> County,and Community plans, identifying priority concerns of communities throughout the State such as infrastructure, multi-
<br /> ' modal transportation connectivity, community design,and natural and cultural resource management. HHF also identified
<br /> opportunities of mutual benefit to Military,State,County, and Community for potential action,with consideration of programs
<br /> underway,and related stakeholder groups for collaboration to optimize investments and maximize benefits.
<br /> Project Cost: $75K
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Joint Base Pearl Harbor Hickam Wastewater Treatment Plant Siting Study24 PROFESSIONAL SERVICES CONSTRUCTION(If
<br /> March 2025 Ongoing applicable)
<br /> n/a
<br /> JBPHH,O'ahu
<br /> 3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE
<br /> b.
<br /> HHF is leading the analysis of alternatives for WWTP relocation based on a rigorous evaluation of potential sites using screening
<br /> criteria to determine appropriate location and constructability.The study assesses operational impacts, infrastructure modification
<br /> needs,design requirements,and estimated costs for the three alternatives. Detailed tsunami analyses are being conducted to
<br /> determine probable depths and velocities to ensure mitigation measures adequately protect the facilities.
<br /> Project Cost: $1.1 M
<br /> f 1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Honolulu Multi-Hazard Pre-Disaster Mitigation Plan Update PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Islandwide,O'ahu 2019 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm
<br /> HHF project lead for public engagement assistance and plan integration analysis to measure the extent of natural hazards
<br /> consideration in general and community plan land use policies and recommend additions to help establish hazard resilience as a
<br /> key factor in future development and community planning. Focus areas included development regulations, land
<br /> acquisition/transfer,financial incentives, land use analysis and permitting, public facilities, post-disaster reconstruction,and capital
<br /> improvements.
<br /> Project Cost: $42K
<br />
|