|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.) C7C:Cvea,r eft
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Dale Uno Project Administrator a.TOTAL b.WITH CURRENT FIRM
<br /> 30 5
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Oceanit Laboratories, Inc, Honolulu, Hawaii
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> Bachelor of Arts/English/University of Hawaii at Manoa/1994
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Proficient in both Windows and Mac operating systems, as well as in the use of industry-standard software programs: Word, Excel,
<br /> Outlook, PowerPoint, Photoshop, and Quickbooks Pro.
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Organizational Change Management for Hawaii Gas' Project FOCUS PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (For Our CUStomers) 2023
<br /> Hawai`i (statewide)
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Community Outreach Specialist. Assisted with conducting Design Thinking workshop for the project's core team
<br /> a, and numerous individual and group stakeholder meetings; engaged clients in industry-standard methods and
<br /> practices to guide them through a structured OCM approach that yielded a comprehensive stakeholder analysis
<br /> matrix, as well as a deep understanding of individual and group needs. Developed and implemented an OCM
<br /> plan that provided a structure for engaging with stakeholders through each phase of the project. Managed
<br /> documentation of interactions with clients and stakeholders; maintained several logs and issue trackers. Drafted
<br /> and submitted final report which included lessons learned and recommendations as requested by the client.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> North Kawaihae Small Boat Harbor Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kawaihae, Big Island, Hawaii 2025
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Researched pre-consultation list; assisted with pre-consultation process and managed documentation.
<br /> Environmental Assessment drafting and editing.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waikiki Aquarium Discharge System Upgrade PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> c. Honolulu, Oahu, Hawaii 2023
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Environmental Assessment drafting and editing.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Moloa'a,Waimea Water Supply PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kaua'i, Hawaii 2022
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Helped resolve a boundary dispute involving the Kaua'i Department of Water, DAGS Land Survey Division, DLNR
<br /> and HDOT.The resolution required updating of a survey map and description on the legal document.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kauai Kailani Beach Restoration PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kapa'a, Kauai, Hawaii 2021
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> e. Facilitated introduction of concurrent resolutions in both houses of the Legislature which was a requirement for
<br /> an easement needed for the project. Liaised with DLNR and kept clients updated on status of the legislation. HCR
<br /> 166 was adopted by the Legislature.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kahana Bay Erosion Mitigation Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kahana, Maui, Hawaii 2021
<br /> f. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Assisted in preparation of the Environmental Impact Statement (EIS) Preparation Notice and Draft EIS for beach
<br /> restoration at Kahana Bay, Maui. Assisted in responses to hundreds of public community and agency comments.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Ala Wai Watershed Flood Mitigation Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, Oahu, Hawaii 2020
<br /> g. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Community Outreach Specialist. Facilitated Oceanit's engagement with members of the community, elected
<br /> officials, government agencies, and organizations.
<br /> STANDARD FORM 330( REV. 7/2021) PAGE 1
<br />
|