Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) C7E70Y0,r eft <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Stephen B.Wilson Project Administrator a.TOTAL b.WITH CURRENT FIRM <br /> 52 6 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Oceanit Laboratories, Inc, Honolulu, Hawaii <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS/1973/Mechanical Engineering <br /> MBA/1980/Business Administration <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Navy SCUBA Qualified, Drydock Master, Software Engineering Institute/Carnegie Mellon Capability Maturity Model, Hammer& <br /> Champy's Business Process Reengineering (BPR), Total Quality Management(TOM), International Organization for Standardization <br /> ISO 9001 auditor, Legislative Auditor for State of Hawaii (management& performance audits) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> North Kawaihae Small Boat Harbor Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kawaihae, Hawaii 2025 (est.) <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Project Manager- Provided damage assessment reports, construction plans, specifications and cost estimates for <br /> the main breakwater, rock revetment, parking lot, boat washdown and drainage improvements, utility upgrades, <br /> a drainage evaluation, wave modelling and report, an Environmental Assessment, and all required permits. The <br /> a. main breakwater that is supposed to protect the harbor, has undergone major repairs in the past due to wave <br /> damage. The most recent wave damage occurred in January 2020, rendering the marginal wooden wharf and <br /> much of the harbor utilities unusable. The proposed improvements will strengthen the compromised <br /> breakwater, construct a sand berm along the shoreline to prevent sand from accumulating on the boat ramp and <br /> replace or repair damaged infrastructure. Estimated Construction Cost: Main Breakwater -$4.62 M, <br /> Infrastructure Improvements -$1.16 M <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kahana Nui Basin Dam, Department of Public Works PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kahana, Hawaii ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> b' Project Manager-Oversaw Hydrological and H Hydraulic analysis, Spillway Adequacy Analysis, updated design for <br /> j gY Y p� Y q Y Y p g <br /> outflow intake and dam controls, prepared design report, prepared and submitted application for approval of <br /> Plans and Specifications to the Hawaii Dam Safety Program. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Ala Wai Watershed Flood Mitigation Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, Hawaii 2020 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> C. Project Manager-Oversaw hydrologic and hydraulic computer modeling of watershed, developed conceptual <br /> designs for flood mitigation solutions, conducted engineering review of USACE flood mitigation plans, performed <br /> community engagement and outreach meetings, coordinated activities with stakeholders, agencies, and <br /> community. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> General Manager and Construction Engineer PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kailua-Kona and Honolulu, Hawaii 2004-2006 2004-2006 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> d. Construction& Operations Management-Construction of modular homes using light gauge steel frames and <br /> trusses that were manufactured from coils of light gauge steel in a plant environment. Manufactured entire <br /> home in two pieces that were trucked to job site and assembled and closed up. Homes were secured to <br /> foundations and utilities connected. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> General Manager/Aloha Aina Homes, LLC PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kailua-Kona and Honolulu, Hawaii 2004-2005 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> Helped to establish new business to manufacture modular homes using light gauge steel frames and trusses in a <br /> e. new plant environment. Left company to start up similar operation in Honolulu. Worked with consultants to <br /> plan, develop and implement operating plan. Served as onsite engineer. Defined and implemented <br /> Manufacturing Process Management Systems. Documented and implemented standard operating procedures <br /> (Safety Manual/Program, Steel Stud Quality Control Manual & Plant Quality Control Manual) and quality <br /> standards. <br /> STANDARD FORM 330( REV. 7/2021) PAGE 1 <br />