Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> a. TOTAL b. WITH CURRENT FIRM <br /> Myounghee Noh Industrial Hygienist 32 25 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Myounghee Noh &Associates, L.L.C. <br /> Aiea, Hawaii <br /> 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> M.S. Chemistry, University of Hawaii at Manoa State of Hawaii Certified Asbestos & Lead Professional <br /> MBA University of Phoenix, Honolulu <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certified Industrial Hygienist (CIH); Certified Safety Professional (CSP) <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> Construction Capacity Analysis, Tinian, Commonwealth of PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> the Northern Mariana Islands 2019 <br /> a. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> Role: Chemist Scope: Construction capacity analysis. Attended the AE site visit to Tinian and met with <br /> government officials for potential resource-impact assessments, including sites with chemical contaminants and <br /> UXO/MEC. Interviewed CNMI regulators, Fish &Wildlife, and Public Safety staff. Cost: $62,488 <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> LBP-and Hexavalent Chromium-containing Paint PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Abatement, Tanks 2, 4, 6 &31, DFSP Diego Garcia, BIOT 2023 <br /> b (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> Role: Chemist Scope: Compliance. Provided quality assurance for fuel tank cleaning and restoration. Worker <br /> and environmental exposure concerns were due to lead, cadmium, hexavalent chromium (Cr+6), etc. Contractor <br /> blasting practice and methodology were evaluated to anticipate the worst case scenario chemical hazards and to <br /> specify performance requirements. Cost: $220,000 <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> Code 6 Full Design for ambulatory Care Clinic, Kwajalein PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Atoll, Republic of Marshall Islands 2019 <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> C. Role: Chemist Scope: Code 6 Design. Chemical data were evaluated for environmental risks potentially <br /> affecting the design & construction of the new clinic. In addition to hazardous building materials demo-survey, soil <br /> was assessed for the existing conditions that could impact the design and construction where there were known <br /> contaminations from an abandoned fuel line and chemical-impacted areas. The findings were compared to the <br /> USAKA Environmental Standards. Cost: $119,764 <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> HDOT-Highways Division, Hazard Assessment for Kakoi PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> and Keehi Baseyards, Honolulu 2018 <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> d. Role: IH Scope: Exposure Assessment. Assessed the industrial shops space air quality, identified and <br /> measured contaminants, including welding shop, motor pools, warehouse, engine shop, sign shop, and electrical <br /> shop. Included various stressors, such as airborne metals and metal oxides from welding, particulates and volatiles <br /> from motor pools and engine shop, organics from the sign shop, and full particle analysis for service trailer complex <br /> and solid waste transfer area (near major highway). Cost: $36,028 <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> Exposure Assessment for Site 1 Camp Navarro and Edwin PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Andrews Air Base,Zamboanga, Mindanao, PI 2018 <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> e. Role: IH Scope: Exposure Assessment. Led a team of industrial hygienists for hazmat survey and worker <br /> exposure assessments at multiple facilities, including barracks, dining hall, controlled area, billeting, warehouse, <br /> offices, base yard/workshops, and a hangar. Real time air quality measurements were made, and air samples <br /> were collected and submitted for laboratory analyses for dust, diesel particulates, mold spores, radiation, volatiles, <br /> and welding fumes. Cost: $145,876 <br />