Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Joanna Boyette, B.A. a TOTAL b WITH CURRENT FIRM <br /> Ng Industrial Hygienist 21 18 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Myounghee Noh &Associates, L.L.C. <br /> Aiea, Hawaii <br /> 16. EDUCATION(DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.A. English, University of Hawaii at Manoa State of Hawaii Certified Asbestos & Lead Professional <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Hazardous Waste Operations & Emergency Response <br /> OSHA 40 Hour Construction Safety <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> FY20 Repair AMR Child Development Center Bldg. 1783, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Aliamanu Military Reservation, Oahu, Hawaii 2021 <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> a. Role: Project Manager/Industrial Hygienist Scope: Comprehensive HAZMAT and AHERA investigation and Code 2 <br /> and Code 6 support. Attended the charrette, conducted a hazardous material survey at the entire building, adjacent <br /> building, and storage and chiller, and provided specifications, basis of design, and cost estimate, in support of total <br /> renovation of the CDC facility with electrical, architectural, civil, and mechanical improvements. Cost: $33,798 <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> Special Project Repair Building 489, DLA Distribution PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Warehouse, JBPHH, Oahu 2021 <br /> b. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> Role: Industrial Hygienist Scope: Provided design support which included an existing conditions survey of multiple <br /> buildings for hazardous materials. Delivered cost estimate and specifications for hazard mitigations due to building <br /> hazmat and soil contaminants. Cost: $139,519 <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> Achieve Hexavalent Chromium Compliance, Building 1790, Air PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Station Barbers Point, US Coast Guard, Oahu 2020 <br /> C. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> Role: Industrial Hygienist Scope: Provided a hazardous materials survey which included stressors such as <br /> asbestos, lead, and hexavalent chromium (waste product from aircraft blade maintenance). Provided design <br /> documentation including specifications, cost estimate, and bid support. Cost: $18,647 <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> Health & Safety and Air Monitoring for Operational Range PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Clearance and Maintenance at Puuloa Training Facility 2019 <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> d. Role: Industrial Hygienist Scope: Performed as Site Safety and Health Officer and Project Monitor. Monitored <br /> workers and environmental exposures to lead in soil and dust. Anticipated, recognized, evaluated, and controlled <br /> lead hazards, and monitored the work site for proper engineering and administrative controls. Implemented proper <br /> personal protective equipment program. Daily monitoring included personal and environmental air sampling. Cost: <br /> $28,782 <br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED <br /> Special Project Repair Building 489, DLA Distribution PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Warehouse, JBPHH, Oahu 2022 <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm <br /> e. Role: Project Manager/Industrial Hygienist Scope: Conducted a pre-design study with a building hazmat survey and <br /> cost estimate. The old distribution warehouse was in need of electrical, telecommunication, architectural, civil, and <br /> structural upgrades. Based on the hazmat survey results, including visual survey and sampling and analyses of <br /> suspected building materials, hazardous components were identified, and contributed to the concept design. Cost: <br /> $28,107 <br />