E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> 'e (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> a. TOTAL b. WITH CURRENT FIRM
<br /> Eunjin Kotkovetz, P.E., CIH Environmental Engineer, U.S. Registered 21 16
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Myounghee Noh &Associates, L.L.C.,Aiea, Hawaii
<br /> 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> M.S. Env Engineering, University of Seoul Environmental, District of Columbia, #PE907465
<br /> B.S. Env. Engineering, University of Seoul LEED AP with a Building Design +Construction Specialty, 10350893-AP-BD+C
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> NRPP-Radon Residential Measurement(109528 RMT) &Mitigation Provider(109527 RT)
<br /> Certified Industrial Hygienist(CP 12596)
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED
<br /> FHCON Projects, Replace Andersen Housing Ph Ito XI, PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Andersen AFB,Yigo, Guam 2023 2025
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ✓ Check if project performed with current firm
<br /> a Role: Project Manager/Env. Eng. Scope:Approx.400 former housing buildings were demolished for new houses. Pesticide
<br /> impacted soil (PIS)was found under the building foundations and its immediate vicinities. In addition, hazardous materials
<br /> including asbestos cement pipes were a concern for the earthwork. Provided soil and asbestos mitigation requirements and
<br /> plans including sampling and analysis plan, cost estimates, and specifications. Served as PM/Env. DOR for DBB and DB
<br /> projects and determined/provided project requirements including PIS management, HAZMAT abatements, and radon
<br /> monitoring and mitigation. Cost: $900,000
<br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED
<br /> FY23 MCON PROJECT P-209, Dry Dock#3 Replacement(DD5), PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Joint Base Pearl Harbor-Hickam, Hawaii,Shipyard
<br /> 2023 Ongoing
<br /> Infrastructure Optimization Program (SIOP)
<br /> b. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm
<br /> RoVe: Project Manager/Env. Eng. Scope: Served as environmental DOR and conducted site investigations and provided
<br /> mitigation measures such as contaminated soil/HAZMAT management. Also determined the required construction and
<br /> environmental permits including the Permit Record of Decision (PROD)and prepared specifications/requirements including
<br /> the Basis of Design, cost estimate, bid schedules, etc. Prepared the NPDES permit application packages. Cost:$690,125
<br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED
<br /> Parametric Design Kwajalein Ambulatory Care Clinic PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> U.S.Army Garrison Kwajalein Atoll 2020
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm
<br /> RoVe: Project Manager/Env. Eng. Scope:The site had site contamination due to abandoned fuel pipelines, UST,
<br /> c.
<br /> and PCB-containing transformers. Provided supervision for field investigation. Prepared a site investigation
<br /> report and developed environmental requirements for contaminated soil and groundwater mitigation. Provided
<br /> independent design review for DBB submittals including design analysis and specifications for environmental
<br /> protection requirements, including cultural/archaeological resources and natural resources, and contaminated
<br /> soil mitigation. Cost: $119,764
<br /> (1) TITLE AND LOCATION(City and State) (2) YEAR COMPLETED
<br /> FY13 PAIP LXEZ 13-4286, Improve Family Housing PROFESSIONAL SERVICES CONSTRUCTION(if applicable)
<br /> Infrastructure Ph2, Kadena Air Base, Okinawa,Japan 2018
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE I Check if project performed with current firm
<br /> d. RoVe: Project Manager/Env Eng. Scope: Participated in pre-design conference and coordinated with base
<br /> personnel to identify potential site environmental issues and requirements. Conducted a Phase I Environmental
<br /> Site Assessment along the planned utility corridors to identify recognized environmental conditions at the subject
<br /> sites, planned to be disturbed due to construction. Provided site investigations and hazardous material surveys,
<br /> documentation of design concept, cost estimate, and specifications. Cost: $54,376