Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> Darin N. Chinen, PE Project Manager or Technical a.TOTAL b.WITH CURRENT <br /> Resource/Quality Assurance FIRM <br /> 36 36 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> WSP USA Inc., Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> M.B.A. Hawaii, Professional Engineer <br /> B.S., Civil Engineering <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> American Society of Civil Engineers <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Program and Project Management for Rehabilitation of Streets, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> On-Going On-Going <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. Project manager responsible for the execution of the Rehabilitation of Streets project. Project scope includes program and project <br /> management for the City and County of Honolulu's rehabilitation of streets CIP program. Tasks include preparation of annual CIP <br /> budgets, programming of new projects, tracking of program funds, project management of individual consultant contracts, and <br /> preparation of construction documents for in-house design projects. <br /> Current Contract Fee: $8.0 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Fort Barrette Road Widening, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> On-going <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> b. Project manager responsible for the design of this roadway widening project. The project includes widening the roadway from two to <br /> six lanes and includes new pedestrian and bikeway facilities, drainage and grading, signing and striping, traffic signal and street lighting <br /> systems, utility relocations, permanent best management practices, landscaping, and irrigation. Project scope includes preparation of <br /> final PS&E, drainage reports and calculations, and coordination of permitting required for project construction. <br /> Estimated Construction Cost: $16 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kapiolani Boulevard Reconstruction, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2011 2015 <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> `' Project manager responsible for the design of this roadway reconstruction project. The project includes reconstruction of existing <br /> asphalt concrete pavement, installation of portland cement concrete (PCC) pavement bus lanes, pavement markings design, <br /> reconstruction of existing concrete curbs, concrete catch basin repair, and street light and traffic signal systems. Project scope <br /> includes preparation of final plans, specifications, and cost estimate (PS&E), and coordination of permitting required for project const. <br /> Contract Fee: $680 thousand. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Reconstruction of Wilhelmina Rise, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2010 2018 <br /> d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project manager responsible for the design of this PCC pavement reconstruction project. The project includes reconstruction of PCC <br /> pavements, pavement markings design, reconstruction of existing concrete curbs concrete catch basin repair, and tree removals. <br /> Project scope includes preparation of final PS&E, and coordination of permitting required for project construction. <br /> Contract Fee: $197 thousand <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waipio Point Access Road Improvements, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2010 2016 <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> e. Project manager responsible for the design of this roadwayimprovements project. The project includes reconstruction of existing <br /> 9 p 9 � p p J <br /> roadway, new pedestrian and bikeway facility, drainage and grading improvements,signing and striping, street lighting systems, utility <br /> relocations, and permanent best management practices. Project scope includes preparation of final PS&E, drainage report and <br /> calculations, and coordination of permitting required for project construction. <br /> Contract Value: $455 thousand <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 3 <br />