|
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE
<br /> Darin N. Chinen, PE Project Manager or Technical a.TOTAL b.WITH CURRENT
<br /> Resource/Quality Assurance FIRM
<br /> 36 36
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> WSP USA Inc., Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> M.B.A. Hawaii, Professional Engineer
<br /> B.S., Civil Engineering
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
<br /> American Society of Civil Engineers
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Program and Project Management for Rehabilitation of Streets, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> On-Going On-Going
<br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> a. Project manager responsible for the execution of the Rehabilitation of Streets project. Project scope includes program and project
<br /> management for the City and County of Honolulu's rehabilitation of streets CIP program. Tasks include preparation of annual CIP
<br /> budgets, programming of new projects, tracking of program funds, project management of individual consultant contracts, and
<br /> preparation of construction documents for in-house design projects.
<br /> Current Contract Fee: $8.0 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Fort Barrette Road Widening, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> On-going
<br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> b. Project manager responsible for the design of this roadway widening project. The project includes widening the roadway from two to
<br /> six lanes and includes new pedestrian and bikeway facilities, drainage and grading, signing and striping, traffic signal and street lighting
<br /> systems, utility relocations, permanent best management practices, landscaping, and irrigation. Project scope includes preparation of
<br /> final PS&E, drainage reports and calculations, and coordination of permitting required for project construction.
<br /> Estimated Construction Cost: $16 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kapiolani Boulevard Reconstruction, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2011 2015
<br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> `' Project manager responsible for the design of this roadway reconstruction project. The project includes reconstruction of existing
<br /> asphalt concrete pavement, installation of portland cement concrete (PCC) pavement bus lanes, pavement markings design,
<br /> reconstruction of existing concrete curbs, concrete catch basin repair, and street light and traffic signal systems. Project scope
<br /> includes preparation of final plans, specifications, and cost estimate (PS&E), and coordination of permitting required for project const.
<br /> Contract Fee: $680 thousand.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Reconstruction of Wilhelmina Rise, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2010 2018
<br /> d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project manager responsible for the design of this PCC pavement reconstruction project. The project includes reconstruction of PCC
<br /> pavements, pavement markings design, reconstruction of existing concrete curbs concrete catch basin repair, and tree removals.
<br /> Project scope includes preparation of final PS&E, and coordination of permitting required for project construction.
<br /> Contract Fee: $197 thousand
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waipio Point Access Road Improvements, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2010 2016
<br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> e. Project manager responsible for the design of this roadwayimprovements project. The project includes reconstruction of existing
<br /> 9 p 9 � p p J
<br /> roadway, new pedestrian and bikeway facility, drainage and grading improvements,signing and striping, street lighting systems, utility
<br /> relocations, and permanent best management practices. Project scope includes preparation of final PS&E, drainage report and
<br /> calculations, and coordination of permitting required for project construction.
<br /> Contract Value: $455 thousand
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 3
<br />
|