Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Larissa M.L. Sato, PE Project Manager or Environmental Task a.TOTAL b.WITH CURRENT <br /> Leader(Environmental) FIRM <br /> 36 34 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> WSP USA Inc., Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering Hawaii, Professional Engineer; California, Professional Engineer <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Statewide Storm Water Management Program, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2009 <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Deputy program manager responsible for assisting the State of Hawaii, Department of Transportation, Highways Division (HDOT) in its <br /> development and implementation of a Statewide Storm Water Management Program to address the requirements of HDOT's Municipal <br /> a. Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination System (NPDES) Permit and Consent Decree. The <br /> program involved a multitude of tasks which includes planning, design, construction, and maintenance elements related to storm water <br /> issues. This multi-tasked project involved development and implementation of Best Management Practices (BMP) inspections, <br /> standards, and manuals; training of contractor, consultant and HDOT personnel; an asset management system for highway drainage <br /> facilities, a public information/education program, proposing an organizational structure for a new NPDES Department, and <br /> development of other programs to be in compliance with NPDES requirements. <br /> Contract Fee: $27 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> EPA Public Education and Training Program, Phase 2, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2020 <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project manager responsible for assisting the State of Hawaii, Department of Transportation, Highways Division (HDOT) in training <br /> b. HDOT construction personnel, consultants, and contractors on environmental permitting issues. The project involves developing <br /> processes and procedures, conducting trainings, and assisting HDOT to ensure compliance with HDOT's Consent Decree, MS4 <br /> NPDES Permit, Oahu Storm Water Management Program Plan, and projects environmental permits. Tasks include review of project's <br /> Site-Specific Best Management Practices (BMP)Plans and related amendments, field inspection of BMPs, coordinating with the <br /> Hawaii Department of Health on individual projects environmental permit requirements, and assisting HDOT in responding to DOH <br /> enforcement actions. <br /> Contract Fee: $4.8 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waipio Point Access Road Improvements Study, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2005 2016 <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> c. Project manager responsible for overall coordination of the project's environmental assessment prepared in accordance with HRS <br /> Chapter 343. The project studied several roadway improvement alternatives. Larissa coordinated interagency coordination with the <br /> Navy, Department of Enterprise Services and consultation with the U.S. Fish and Wildlife Service per Section 7 and the State Historic <br /> Preservation Division per Section 106. As a technical writer, Larissa prepared a Section 4(f)evaluation and a Categorical Exclusion <br /> from NEPA. <br /> Contract Fee: $150 thousand <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Environmental Permitting (two contracts), Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> On-going <br /> d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project manager responsible for assisting the City County of Honolulu, Department of Design and Construction, Civil Division. Since <br /> 2015, Larissa has assisted the City and County of Honolulu, Department of Design and Construction, Civil Division (DDC CD)with <br /> environmental compliance in construction. Contract Fee: $3.1 million first contract, $3.0 million second contract <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 4 <br />