Laserfiche WebLink
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY <br /> (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project) <br /> 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED <br /> County of Hawaii's Hakalau Stream Bridge (Bridge No. 29-3) Emergency PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Repairs, Hilo, Island of Hawaii, Hawaii 2017 2018 <br /> 23. PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> County of Hawaii, Department of Public Allan Simeon (808)961-8321 <br /> Works <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> The County of Hawaii's Hakalau Stream Bridge (Bridge No. 29-3)was built in 1930 as a stream crossing for the Old Mamalahoa Highway. <br /> Over time, Hakalau Stream severely eroded the historic bridge's northern abutment creating a large scour cavity beneath the footing. On <br /> February 9, 2017, Mayor Harry Kim issued an emergency proclamation recognizing the"imminent threat of the bridge suddenly collapsing" <br /> and "the need for government agencies and/or representatives from the private sector to mobilize and provide immediate services". The <br /> extent of the scour compromised the bridge's stability, and ultimately affected its ability to safely sustain vehicle loads. The County closed <br /> the bridge to prevent the possibility of property damage and/or bodily injury. <br /> Challenges of this project involved developing an appropriate fix for a historic bridge in the midst of U.S. Fish and Wildlife and National <br /> Marine Fisheries concerns for numerous Section 7-protected species, including the Hawaiian Hawk, nesting waterbirds, and water quality <br /> impacts to essential fish habitat downstream. The project team developed a feasibility study and coordinated with resource agencies to <br /> identify the preferred solution. Relying heavily on <br /> national research, the team developed and _ a 5 <br /> designed an environmentally-sensitive approach ' ' � '" - 0- .'' l"'. <br /> using grout bags to contain the slurry and fill the <br /> growing scour cavity. 4e ,. , <br /> WSP coordinated and prepared documentation for Via" <br /> environmental clearances in NHPA Section 106, <br /> ESA Section 7, Magnuson-Stevens Fisheries Act, ,, �- . <br /> Fish and Wildlife Coordination Act, Section 4(f), <br /> CWA Section 404, CWA Section 401, CZM, and k t -` ' <br /> NEPA Categorical Exclusions. - �- , k V <br /> Compliance with Section 401 of the Clean Water ' • F- ,ter- z�N p .• .4 ! <br /> Act utilized the Hawaii Department of w ` i ' 1� f �' '2r ,,q <br /> Transportation's (HDOT) innovative In Stream �� . "° ? <br /> Manual. WSP provided in water inspections to `' .:b , � <br /> monitor water quality throughout the duration of ; <br /> construction,which verified water quality research _ t, ° ; .� - ., -' <br /> and assumptions undertaken during design. _a; 44 a ,,r i ti t <br /> s ` ., - t..,' p <br /> Furthermore, the inspections ensured consistent �r p «3 � , , <br /> implementation of HDOT's 401 WQC monitoringi. ► "° `'i ,:}d'i k s? ' \. <br /> program as agreed upon with the Hawaii '-°`` +� ,,,,A,„,, <br /> f- } �'_ �: _`,, <br /> Department of Health. '°' ' <br /> -10'The PS&E, and all clearances were obtained in - � .. \•4 ' r, \1- <br /> less than 6 months. , i., ,.. , ` `,L: `) <br /> Contract Value: $247 thousand <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. WSP USA Inc. Honolulu, Hawaii Subconsultant <br /> (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE <br /> b. KSF, Inc. Honolulu, Hawaii Prime Consultant <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 PAGE 14 <br />