My WebLink
|
Help
|
About
|
Sign Out
Home
2024-10-11 Exh B Transcript 1250 OCEANSIDE LLC (PL-BOA-2024-000104 & 105)
PublicDocuments
>
Planning Department
>
Board of Appeals
>
Pending Petitions for Next Hearing Date
>
zCases for Past Hearings
>
PL-BOA-2024-000104 1250 Oceanside, LLC (PD)
>
2024-10-11 Exh B Transcript 1250 OCEANSIDE LLC (PL-BOA-2024-000104 & 105)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 2:39:10 PM
Creation date
1/15/2025 2:39:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VITOUSEK: They have not indicated that to me. <br /> WESLEY-SMITH: Okay, so the public can't access into their property from the end of this road? <br /> BAILEY: Objection as to relevance, outside the scope of this appeals— <br /> LEWIS: Sustain. <br /> BAILEY: —this hearing. <br /> WESLEY-SMITH: Okay, so let's focus on construction standards briefly. If this road was built to <br /> urban dedicable standards, what would that mean? <br /> VITOUSEK: Be more hardened surface, wider paving curbs, gutters sidewalks, more potential for <br /> storm water runoff. <br /> WESLEY-SMITH: So, more concrete. <br /> VITOUSEK: Yep. <br /> WESLEY-SMITH: Okay, and it would be less rural that it's built right now. <br /> VITOUSEK: Correct. <br /> WESLEY-SMITH: Okay, let's get to the heart of Oceanside's position on this matter. So, right <br /> now ordinance 96-8 requires dedication of the connector road and the Makai Halekii extension <br /> road, right? <br /> VITOUSEK: Correct. <br /> WESLEY-SMITH: And there's been discussions about what sort of construction is required. <br /> Urban dedicable standard or not in order for that dedication to take place, right? <br /> VITOUSEK: Yes. <br /> WESLEY-SMITH: So Mike, there's some suggestions from intervenor Coupe that Oceanside is <br /> essentially ignoring their dedication and construction standard. Is that how you took their opening <br /> today? <br /> BAILEY: I'm going to object. This is outside the scope of the orders. There's no language about <br /> LEWIS: Sustain. <br /> WESLEY-SMITH: Yeah, I think that we're just asking our witness to respond to the assertions <br /> make in opening statement. <br /> LEWIS: If you want to do that I—it is—it's not—it's not relevant to this situation, I mean we—I <br /> think we kind of see where this is going. <br /> WESLEY-SMITH: Okay. Okay a few questions. <br /> LEWIS: Streamline that pretty <br /> EXHIBIT B <br /> Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.