Laserfiche WebLink
Table 1 <br /> Opinion of Probable Cost <br /> SEP Workplan Implementation,Kailua-Kona Landfill <br /> Item <br /> A.Workplan Development $7,500 <br /> Workplan incl.SAP/QAPP <br /> B.Screening Level $35,900 <br /> Aerial Photogrammetry(Infrared and B&W imagery,2 events) <br /> Land Surveying(topographic tie-in,2 events) <br /> Topographic&Thermal Mapping(2 events) <br /> Interviews/Historic Data Accumulation <br /> Site Reconnaissance/Surface Screening <br /> Surface Temperature Probes(22 probes) <br /> Existing Well Screening(assume 4 wells,PID and methane) <br /> Data Interpretation,Mapping,Report Preparation <br /> C.Fire Suppression Pilot Demonstration $141,000 <br /> Suppression Work Plan Preparation <br /> Construct Suppression Deck <br /> Class A Fire Retardant Foam <br /> Excavation/Ex-Situ Foam Suppression <br /> Trenching/ In-Situ Foam Suppression <br /> Fire Suppression Demonstration <br /> Backfill Treated Waste/Place Cover Materials <br /> Install Thermocouples <br /> Post-Suppression Monitoring <br /> Report Preparation <br /> SUBTOTAL: $184,400 <br /> Contingency @ 10 Percent $18,440 <br /> TOTAL ESTIMATED COSTS: $202,840 <br /> ERM Kailua-Kona Landfill/0061204-03/14/2008 <br />