My WebLink
|
Help
|
About
|
Sign Out
Home
2008-01-AU Limited Scope Performance Audit Report Department of Public Works CIP Contract Change Orders and Supplements for FY 2006-2007
PublicDocuments
>
Legislative Auditor
>
Audit Reports
>
County Auditor Reports
>
2008-01-AU Limited Scope Performance Audit Report Department of Public Works CIP Contract Change Orders and Supplements for FY 2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2011 3:17:12 PM
Creation date
7/19/2011 3:10:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Implementation and enforcement of regulatory requirements under Hawaii <br />County Code chapters 10 (Erosion and Sedimentation Control), 22 (County <br />Streets) and 27 (Flood Control). <br />• Provision of comments /opinions to the Planning Department on land use related <br />matters such as subdivision, rezoning and variance applications and SMA, use <br />and special permits. <br />• Investigation and resolution of regulatory complaints. <br />• Review and approval of all private construction plans (except building permit <br />plans), traffic reports, flood studies, environmental documents, etc. related to the <br />interests and regulatory authority of the Department. <br />• Design and Investigation Section: <br />• Planning, design and construction for civil engineering (non - building) County <br />capital improvement projects. <br />• Investigation and resolution of roadway, drainage and other related complaints. <br />• Drafting services for County projects. <br />• Construction Inspection Section: <br />■ Inspection services for civil engineering (non - building) County capital <br />improvement projects, private subdivision and development construction, and the <br />following regulated activities and programs: <br />• Grading, grubbing and stockpiling work (Hawai`i County Code chapter <br />10). <br />• Construction within the County rights -of -way (Hawai`i County Code <br />chapter 22). <br />• Federal Highway Administration (FHWA) National Bridge Inspection. <br />The Engineering Division has 37 budgeted positions for FY 2007- 2008: <br />CivilEngineering .............................................. <br />.............................15 <br />EngineeringAides ........................................... <br />............................... 2 <br />Engineering Drafting ......................................... <br />............................... 3 <br />Construction Inspection ...................................... <br />.............................11 <br />LandSurveying ............................................... <br />............................... 3 <br />PermitClerks ................................................. <br />............................... 3 <br />The Building Division is responsible for: <br />• Planning, design, procurement and construction management of County facilities. <br />• Administration and enforcement of building, plumbing and electrical codes, sign and <br />outdoor lighting ordinances, and energy efficiency standards. <br />• Residential and commercial plan reviews for all building, electrical and plumbing <br />permit applications for compliance with current applicable standards and codes. <br />• Janitorial and grounds maintenance of County facilities. <br />• In -house building maintenance services including routine carpentry, electrical, <br />painting and plumbing for County facilities. <br />• Assistance to the Highway Maintenance Division for repair of timber bridges. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.