My WebLink
|
Help
|
About
|
Sign Out
Home
Multi-Hazard Mitigation Plan: 19. Mitigation Strategy
PublicDocuments
>
Civil Defense
>
Multi-Hazard Mitigation Plan 2010
>
Multi-Hazard Mitigation Plan: 19. Mitigation Strategy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2011 8:07:28 AM
Creation date
8/11/2011 8:06:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 19:Mitigation Strategy <br /> I.D.No. Project Description Hazards Lead Agency Status <br /> 1.8 Identify hardening projects to implement 1993 Earthquake,Hurricane Civil Defense,with Project modernized in current plan <br /> seismic evaluation study of fire stations and Public Works,Fire, to reference 2009 seismic evaluation <br /> hospitals and Hospitals of current facilities <br /> 1.9 Explore with utilities feasibility of underground Hurricane,Earthquake, Civil Defense,with Continued into current plan <br /> power lines Tsunami Planning&utilities <br /> 1.10 Conduct hazard loss estimation study,incorpo- All hazards Civil Defense Performed in current plan's Hawaii <br /> rate cost-benefit methodology as a factor in priori- County all-hazard assessment of <br /> tizing projects critical facilities <br /> 1.11 Develop routine training program for disaster All hazards Civil Defense This is not a hazard mitigation action <br /> response and recovery <br /> 1.12 Evaluate warning sirens coverage All hazards Civil Defense Completed by HCDA <br /> 1.13 Develop a formal post-event reporting system All hazards Civil Defense This is not a hazard mitigation action <br /> and information clearinghouse <br /> 1.14 Evaluate disaster-level search&rescue capa- All hazards Civil Defense,w/ This is not a hazard mitigation action <br /> bilities Fire,Police,DPW <br /> 1.15 Evaluate vulnerability of County water systems Hurricane,Earthquake Dept of Water Made a more generalized action to <br /> and water trucking capacity Supply,w/Civil improve water resources <br /> Defense <br /> 1.16 Evaluate waterless wastewater disposal options Hurricane,Earthquake Dept of Environ- This is no longer a DEM project <br /> mental Mgt <br /> 1.17 Implement Disaster Debris Action Manual Hurricane,Earthquake, Dept of Environ- This is a post-disaster emergency <br /> Tsunami,Flood mental Mgt operation action rather than hazard <br /> mitigation <br /> 1.18 Develop post-disaster transit plan Hurricane,Earthquake, Mass Transit This is a post-disaster emergency <br /> Tsunami,Flood Agency,w/Civil operation action rather than hazard <br /> Defense mitigation <br /> 1.19 Update debris estimation Hurricane,Earthquake, Dept of Environ- This is a post-disaster emergency <br /> Tsunami,Flood mental Mgt operation action rather than hazard <br /> mitigation <br /> 1.20 Coordinate TDSR sites Hurricane,Earthquake, Dept of Environ- This is a post-disaster emergency <br /> Tsunami,Flood mental Mgt operation action rather than hazard <br /> mitigation <br /> 1.21 Maintain list of debris management contractors Hurricane,Earthquake, Dept of Environ- This is a post-disaster emergency <br /> and update boilerplate contracts Tsunami,Flood mental Mgt operation action rather than hazard <br /> mitigation <br /> 2.0 Ongoing funded studies that need to be incorporated into future updates of this plan <br /> 2.1 Emergency shelter evaluation Hurricane Army COE Continued in current plan <br /> 2.2 GIS mapping of hotels,church shelters,hazard- Hurricane,Earthquake, Data Systems Made a more generalized GIS Multi- <br /> ous waste sites Tsunami,Flooding Hazard Information One-Stop <br /> website <br /> 2.3 Develop probalistic lava flow maps and modeling Lava flow Hawaii Volcanoes Continued in current plan <br /> Observatory <br /> 2.4 Organize public awareness and preparedness All hazards Civil Defense w/ Continued in current plan,however, <br /> program,including CERTs,through Project Research& Project Kumiai no longer exists <br /> Kumiai,also include public education on pet care Development, <br /> Planning <br /> 2.5 Update Emergency Operations Plan All hazards Civil Defense This is obviously an emergency <br /> operation action rather than hazard <br /> mitigation <br /> 2.6 Implement State Drought Plan Drought Civil Defense,with Continued in current plan <br /> Fire and DWS <br /> 2.7 Identify wildfire hazard areas Wildfire State Drought Identified in the current plan <br /> Council,with Civil <br /> Defense&Fire <br /> 19-14 Hawaii County Multi-Hazard Mitigation Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.