Laserfiche WebLink
LOCAL MITIGATION PLAN REVIEW CF <br /> C. Does the new or updated plan describe Chapter 3,Section 3.3.1 This element is discussed in Ch 3 and Ch 17. <br /> vulnerability in terms of the types and Chapter 17,Section 17.3 Note: A"Needs Improvement"score on this requirement will <br /> numbers of future buildings,infrastructure, Chapter 17,Section 17.4 not preclude the plan from passing. X <br /> and critical facilities located in the identified <br /> hazard areas? <br /> SUMMARY SCORE X <br /> 10.Assessing Vulnerability: Estimating Potential Losses <br /> Requirement§201.6(c)(2)(ii)(8): [The plan should describe vulnerability in terms of an]estimate of the potential dollar losses to vulnerable structures <br /> identified in paragraph(c)(2)(ii)(A)of this section and a description of the methodology used to prepare the estimate.... <br /> Location in the SCORE <br /> Plan(section or N S <br /> Element annex and page#) Reviewer's Comments <br /> A. Does the updated plan document how the Chapter 1 Appendix A Chapter 1—Appendix A meets this requirement. <br /> planning team reviewed and analyzed this <br /> section of the plan and whether this section X <br /> was revised as part of the update process? <br /> B. Does the new or updated plan estimate Chapter 7,Section 7.4 This element is discussed in Ch 7,Section 7.4;Ch 8,Section 8.4; <br /> potential dollar losses to vulnerable Chapter 8,Section 8.4 Ch 18,Sections 18.1.7,18.1.8(University of Hawaii)and 18.3.3 <br /> structures? Chapter 18,Sections X <br /> 18.1.7,18.1.8,18.3.3 Note: A"Needs Improvement"score on this requirement will <br /> not preclude the plan from passing. <br /> C.Does the new or updated plan describe the Chapter 5,Section 5.4 This element is satisfied in Ch 5,section 5.4;Ch 8,Section 8.4; <br /> methodology used to prepare the estimate? Chapter 8,Section 8.4 and Ch 18,Sections 18.1.7,18.1.8,and 18.3.3 <br /> Chapter 18,Sections X <br /> 18.1.7,18.1.8,18.33 Note: A"Needs Improvement"score on this requirement will <br /> not preclude the plan from passing. <br /> SUMMARYSCORE X <br /> J U L Y 1 , 2 0 0 8 (W I D F I R M) 12 <br />