Laserfiche WebLink
• See revised Chapter 15 which <br /> has Hawaii County specific <br /> information and mitigation <br /> actions further developed by the <br /> Hawaii Wildfire Management <br /> Or anization. <br /> SUMMARYSCORE X <br /> B. Assessing Vulnerability: Addressing Repetitive Loss Properties <br /> Requirement§201.6(c)(2)(ii): [The risk assessment]must also address National Flood Insurance Program(NFIP)insured structures that have been <br /> repetitively damaged floods. <br /> Location in the SCORE <br /> Plan(section or N S <br /> Element annex and page#) Reviewer's Comments <br /> A. Does the updated plan document how the Ch.10 Floods satisfies this element,well done. <br /> planning team reviewed and analyzed this <br /> section of the plan and whether this section <br /> was revised as part of the update rocess? <br /> B.Does the new or updated plan describe Chapter 10,Section 10.3.1.2 Ch.10 Floods satisfies this element. X <br /> vulnerability in terms of the types and See 10.3.1.1 NFIP Flood Insurance Profile for Hawaii County. <br /> numbers of repetitive loss properties X <br /> located in the identified hazard areas? Note:This requirement becomes effective for all local <br /> plans approved after October 1,2008. <br /> SUMMARYSCORE <br /> 9. Assessing Vulnerability: Identifying Structures X <br /> Requirement§201.6(c)(2)(ii)(A): The plan should describe vulnerability in terms of the types and numbers of existing and future buildings,infrastructure,and <br /> critical facilities located in the identified hazard area.... <br /> Location in the SCORE <br /> Plan(section or N S <br /> Element annex and page#) Reviewer's Comments <br /> A. Does the updated plan document how the Chapter 1 Appendix A Chapter 1—Appendix A meets this requirement. <br /> planning team reviewed and analyzed this <br /> section of the plan and whether this section <br /> was revised as part of the update rocess? <br /> B. Does the new or updated plan describe Chapter 5,Section 5.5.1.1 This element is addressed in Ch 5,Ch 7,Ch 8,and Ch 18. X <br /> vulnerability in terms of the types and Chapter 7,Section 7.4 <br /> numbers of existing buildings,infrastructure, Chapter 7,Section 7.5.1 Note: A"Needs Improvement"score on this requirement will X <br /> and critical facilities located in the identified Chapter 8,Section 8.4 not preclude the plan from passing. <br /> hazard areas? Chapter 18,Sections <br /> 18.1.7,18.1.8,18.3.3 <br /> J U L Y 1 , 2 0 0 8 (W I D F I R M) 11 <br />