Laserfiche WebLink
fair share credit. <br />(h) The following types of rezoning applications shall be required to submit a TIAR when required by <br />this section, but shall not be required to perform area mitigation: <br />(1) Residential or other rezonings where the applicant commits, and the conditions of zoning require <br />that the project earn at least two times the number of affordable housing credits otherwise required <br />under Chapter 11, County affordable housing policy, provided further that the applicant shall be <br />entitled to the full amount of "excess credits" under section 11 -15, County affordable housing <br />policy, based on the number of affordable housing credits normally required. <br />(2) Rezoning to CV, CN, MCX, PD, or ML where the council determines that the project will reduce <br />regional traffic congestion by providing necessary commercial or light industrial opportunities to <br />serve an area where there is a shortage of available space zoned for such uses, and substantial <br />residential development has already been approved, provided that conditions of zoning shall ensure <br />that any commercial development be of a scale consistent with the standards of a "neighborhood <br />center" as described in the General Plan. <br />(i) The restrictions on occupancy shall not apply to the construction of infrastructure such as water <br />tanks, roads, sewage treatment plants, or other project elements that do not generate substantial traffic. <br />6) The council may designate critical road areas by ordinance. <br />(k) In a critical road area, all rezonings shall be subject to local and area mitigation, except as stated in <br />subsection (h). <br />(1 ) In order to determine whether a rezoning application meets the TIAR threshold of 50 or more peak <br />hour trips, and to prevent applicants from going below the TIAR threshold by dividing a project into <br />segments, the director shall review all development proposed on the same or adjacent properties, and <br />shall include traffic that may be generated by any development application approved after the effective <br />date of this ordinance, or by any other pending development application, if it is on a portion of the same <br />lot or tax map key parcel, or an adjoining lot or tax map key parcel, or in the immediate vicinity of the <br />development. <br />(m) A change of zone application shall not be granted unless: (1) the department of water supply has <br />determined that it can meet the water requirements of the project and issue water commitments using its <br />existing_system• or (2) specific improvements to the existing public water system, or a private water <br />system equivalent to the requirements of the department of water supply will be provided to meet the <br />water needs of the project and conditions of zoning delay occupancy until the necessary improvements <br />are actually constructed. <br />(n) To facilitate the development of village centers in rural areas that are not currently served by a public <br />water system the council may waive the water supply requirements for rezonings for commercial or <br />light industrial uses in areas that do not currently have a public water system, and where the department <br />