Laserfiche WebLink
Chairperson Mukai asked whether a pump was available, or whether a custom pump would have to be <br />built. <br /> <br />Mr. Young said the manufacturer still needs to put together a pump, but these parts are more readily <br />available. <br /> <br />The Manager-Chief Engineer said that most pumps are custom, because of the specific GPM (gallons <br />per minute) and head on the well. Pumps are simply not shelf items, he said. <br /> <br />Chairperson Mukai said that he heard from people at the national conference that other jurisdictions do <br />not have DWS’s problem with having to get custom pumps. <br /> <br />The Manager-Chief Engineer said the pumps on the Mainland are for depths of 80 or 100 feet, while <br />DWS’s pumps are for 800 to 1,000 feet. <br /> <br />ACTION: Motion carried unanimously by voice vote. <br /> <br />6) NORTH KONA: <br /> <br />JOB NO. 2003-823: PALANI ROAD TRANSMISSION WATERLINE (MĀMALAHOA HWY <br />A. <br />TO PALANI NO. 2 RESERVOIR): <br /> <br />The contractor, CTS Earthmoving, Inc., has submitted a request for a contract time extension of thirty- <br />three (33) calendar days, due to a delay by HELCO. <br /> <br />This would be the third time extension to the contract. <br /> <br />If approved, the contract completion date will be extended from September 29, 2011 until <br />October 31, 2011. Engineering staff has reviewed the request, and finds that the thirty-three (33) <br />calendar day time extension is a reasonable request by the contractor to allow HELCO to get on site and <br />complete their work and then for CTS to do operational testing and full start-up. <br /> <br />Extension From (Date) To (Date) Days (Calendar) Reason <br /># <br />1 8/21/11 9/07/11 17 Add’l Work Request by DWS <br />2 9/07/11 9/29/11 22 Add’l Work Request by DWS <br />3 9/29/11 10/31/11 33 HELCO DELAY <br /> TOTAL 72 <br /> <br />The Manager-Chief Engineer recommended that the Board grant this extension of contract time of <br />thirty-three (33) calendar days, to CTS Earthmoving, Inc., for JOB NO. 2003-823, PALANI ROAD <br />TRANSMISSION WATERLINE (MĀMALAHOA HWY TO PALANI NO. 2 RESERVOIR). <br /> <br />MOTION: Mr. Meierdiercks moved to approve; seconded by Mr. Kaneshiro. <br /> <br />Mr. Inaba explained that despite all of DWS’s communications to HELCO to have the electrical service <br />935 <br />be installed at the new tank site, it was learned that HELCO was instead preparing for installation at <br />the new 595 tank site – which already has electrical service. DWS found out about the <br />miscommunication through the project’s electrical subcontractor, and DWS stepped in. As a result, <br />HELCO had to go back and reschedule installation at the new 935 tank site, where there is no current <br />HELCO service, Mr. Inaba said. He noted that this project will serve three separate tanks: <br /> <br /> The existing 935 tank; <br /> <br /> The new 935 tank (completely separate from our existing system, which then feeds down into: <br /> <br /> The new 595 tank, which is adjacent to our existing reservoir site. <br />Page 10 of 29 9-27-11 ~ Water Board Minutes js <br /> <br /> <br />