Laserfiche WebLink
d. PROPOSED UNITS <br />There will be two buildings; one larger to contain the dialysis center and <br />administration and a smaller to house the geriatric services. Building A is 10,400 <br />square feet and Building B is 2,400 square feet. The dialysis center will have 16 <br />chairs and 4 isolation rooms. The geriatric clinic will have four exam rooms. <br />e. TIMEFRAME AND COST <br />Construction will take approximately two years from Plan Approval. The projected <br />cost of the development will be between $200 to $400 per sq. ft. for the 12,,800 sq. <br />ft. buildings and basic infrastructure. The cost of tenant improvements and <br />equipment will depend on the state of the art equipment. <br />f. EMPLOYEES AND CLIENTELE <br />The dialysis center will have sixteen chairs providing dialysis to 32 patients per <br />day. There will be two nephrologists and four nurses for these patients and two <br />office managers. The geriatric clinic will see 32 patients per day with two physicians, <br />four nurses and one office manager. <br />The dialysis center would operate six days per week, Monday through Saturday. The <br />hours of operation will be six a.m. to six p.m. on Monday,, Wednesday and Friday, and <br />eight a.m. to eight p.m. on Tuesday, Thursday and Saturday. The geriatric clinic <br />would operate five days per week, Monday through Friday. The hours of operation <br />will be nine a.m. to five p.m. <br />g. PARKING ARRANGEMENT <br />Parking will be provided on site. Proposed are a total of 50 parking spaces; 34 <br />of standard size, 14 compact size and 2 ADA accessible. <br />h. TRAFFIC IMPACTS <br />The subject parcel is located at the southeastern side of the intersection of the <br />Pahoa Kalapana Road, the Pahoa Kapoho Road and the Pahoa Village Road. The <br />Pahoa Bypass Road begins on the other side of this intersection. The existing traffic <br />consists of a combination of commuter traffic (local residents traveling, in both <br />directions to work, school, shopping, etc.) and tourist and visitor traffic. This <br />'intersection f u n nels the traffic from these three roads to the Pahoa Bypass Road. <br />The ingress and egress for the proposed use will be from the Pahoa Kapoho Road. <br />The anticipated amount of employees and clientele would result in an increase of <br />maximum 79 vehicles per day to 195 feet of the Pahoa Kapoho Road. Presumably, <br />qq the majority of these vehicles would otherwise be traveling to Hilo via the Keaau <br />Pahoa Road. <br />i. ON-SITE INFRASTRUCTURE <br />Proposed on-site 'Infrastructure includes installing an approved driveway with <br />recommended drainage, installing security lighting, and construction of a <br />septic system complying with the State Department of Health regulations. <br />