Laserfiche WebLink
Communication No. 2012 -57.2 <br />C. Existing Structures on the Subject Property at the Time of the Original <br />Application: Within the original Special Permit application submitted in <br />2001, the existing structures represented by the applicant and identified on the <br />site plan were four farm dwellings, a workshop, generator shed and <br />outbuildings. The applicant stated that there were five unpermitted structures, <br />three of which would be removed once the Performance Arts Educational <br />Center was built and the other two would be permitted as two more farm <br />dwellings. Condition No. 4 required the applicant to secure building permits, <br />for all existing farm dwellings /buildings, on the remainder of the property <br />within one (1) year from the effective date of the permit (or by September 21, <br />2002). The applicant did not secure building permits to legitimize the <br />unpermitted dwellings prior to the deadline for Condition No. 4. <br />We are attaching a copy of the original Special Permit application including Figure 3, <br />which is the proposed site plan showing the existing dwellings /structures and the <br />proposed performance center. We are excluding Exhibits A through G, and Figures 1 <br />and 2. (Planning Department Exhibit 2 — Copy of Original Special Permit <br />Application with Figure 3) <br />4. Administrative Time Extension for Condition No. 4 of Special Permit No. 1122: <br />A one -year administrative time extension until October 22, 2003 was granted by the <br />Planning Director on November 8, 2002 to comply with Condition No. 4, which <br />required the applicant to secure building permits for all existing and unpermitted farm <br />dwellings /buildings on the remainder of the property within one (1) year from the <br />effective date of the permit. (Planning Department Exhibit 3 — Letter Dated <br />October 28, 2002 from the Applicant and Letter Dated November 8, 2002 from <br />the Planning Department) <br />5. Administrative Time Extension for Condition No. 3 of Special Permit No. 1122: <br />A 5 -year administrative time extension until September 21, 2011 was granted by the <br />Planning Director on February 27, 2006 to comply with Condition No. 3, which <br />required the applicant to secure Final Plan Approval and establish the performing arts <br />educational center within five (5) years from the effective date of the permit. A <br />number of letters were exchanged between the Planning Department and the applicant <br />0 <br />