Laserfiche WebLink
Part 4 <br />E <br />Mohouli Street <br />Department of <br />be shared with <br />area. <br />Parts 4 and 5 <br />This street has been resurfaced by the <br />Public Works, A proposed bicycle lane may <br />pedestrians to be used by resid4mnts in the <br />Kalanianaole Street -- A combination of bicycle route, lane, <br />and bike /walk paths is proposed to accommodate bicycling <br />to swimming spots, picnic areas, or for recreational riding. <br />Should funding permit, the bikeway could extend the entire <br />length of Kalanianaole Street instead of just part way. <br />Kamehameha Avenue and Silva Street <br />become the major roadway to reach <br />the portion of Kalanianaole Street <br />streets will be less travelled by <br />for a bicycle route. <br />Part 6 <br />Will be widened to <br />the K eauk aha area. Thus, <br />between these two <br />cars and will be suitable <br />Banyan Drive - A two -way bicycle path to be used exclusively <br />for bikes is planned on the outside of one of the existing <br />sidewalks. Lihiwai Street (around Liliuokalani Park) <br />should be restricted to one -way traffic and the other lane <br />used by bicyclists and /or pedestrians. <br />PHASE II - This phase largely connect the major residential areas <br />to the city system devised in Phase I. Six schools, three parks, <br />and the library will be reachable by the bicycle system in <br />addition to the destination points included in Phase I. This <br />phase also proposes an intensive system of bikeways thr ough t W ai l o a <br />Park for recreational riding. The implementation of Phase II is <br />dependent on funding and the need for systems for other areas in <br />the County which may postpone this phase. <br />PHASE III - The main purpose of this phase is to connect the new <br />Waiakea High School and zoo to the rest of the system. The <br />implementation depends on the time of construction of these two <br />developments and completion of Phase II. Planned within Phase III <br />are short paths along the Flood Drainage Canal from the University; <br />and bicycle lanes through the school district of Waiakea High, <br />I ntermedi ate , and Elementary. A new neighborhood park is proposed <br />M18M <br />