My WebLink
|
Help
|
About
|
Sign Out
Home
2014-46 LB-AC 4th Annual Progress Report rev 12Aug14-DRAFT
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2014
>
2014-46 LB-AC 4th Annual Progress Report rev 12Aug14-DRAFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2014 1:14:10 PM
Creation date
7/16/2014 1:35:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AC Champion led effort to widen and improve the shoulders on Hwy. 132 between <br /> Hwy. 130 and the 4 mile marker to provide safer pedestrian and bike usage and to <br /> address hazards from the Albizia"tree tunnel" along the highway. <br /> B. HPP—Pathways Master Plan (PCDP 3.5.3d.3) <br /> AC Champion and HPPOA seek strategies to implement the June 2013 HPP <br /> Pathways Master Plan describing a network of pedestrian and bicycle pathways <br /> within HPP and with connections to Hilo. <br /> C. HWY 137—Red Road (PCDP 4.5.3£5) <br /> AC Champion and local community effort to creates overlook pullouts and <br /> walking/biking pathways along the Red Road co <br /> 14. Establish Hub and Spoke Public Transit Syste a (PCDP 4.2.3b.4) <br /> Mass Transit Subcommittee formed to encour planning and implementation of hub- <br /> and-spoke transit system and develop trans' bs in K `au, Pahoa, Volcano and Mt. <br /> View. <br /> 15. Designate Connecting Roadways in Puna Subd ns (PCDP 4.3.3a.3 & 4.3.3a.5) <br /> AC Champions and community leaders established a ectivity and Emergency <br /> Response Subcommittee of the PCDP AC in order to id co ectivity locations and <br /> to raise public awareness of emergency preparedness. <br /> 16. Designate Red Road (Hwy 137) as a National Scenic Byway(PCDP 4.5.3.f) <br /> AC Champion and community groups submitted an application to the State Department <br /> of Transportation for designation of the Red Road as a Scenic Byway. Application for <br /> designation was accepted and corridor management plan committee established to create <br /> a Red Road Scenic B way Corridor Management Plan. <br /> 17. KAPONO (Kalapana- apoho) <br /> AC Champion initiated grass roots effort to encourage community participation in <br /> identifying and addressing community issues and concerns. Online survey conducted and <br /> KAPONO organization formed. <br /> PCDP PROJECTS NOT STARTED <br /> 1. Upgrade Wastewater Disposal Practices in Lower Puna (PCDP 2.3.3) <br /> Renew efforts tooltablish a plan for Kapoho Beach Lots subdivision that would produce <br /> appropriate wastewater management practices. <br /> 2. Secure Mobile telephone and Internet Service for all of Puna (PCDP 3.4.3.c) <br /> 3. Acquire and Develop Coastal Parks (PCDP 3.5.3.b; 3.5.3.c; 3.5.3.e) <br /> 4. Secure Land & Build Infrastructure for Farmers' Markets (PCDP 3.2.34) <br /> 5. Articulate a policy that promotes Agriculture Tourism (PCDP 3.2.31) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.