My WebLink
|
Help
|
About
|
Sign Out
Home
2014-46 LB-AC 4th Annual Progress Report rev 12Aug14-DRAFT
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2014
>
2014-46 LB-AC 4th Annual Progress Report rev 12Aug14-DRAFT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2014 1:14:10 PM
Creation date
7/16/2014 1:35:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Support Puna Community Medical Center (PCDP 3.3.3a) <br /> Puna Community Medical Center expansion plans include lease of State owned 5-acre <br /> parcel and construction of a new clinic with 24-hour emergency room. <br /> 5. Isaac Hale Beach Park Expansion (PCDP 3.5.1 a) <br /> The FY 2013-14 CIP Budget included $12 million for infrastructure improvements, new <br /> buildings or structures at Isaac Hale Beach Park. <br /> 6. Kikala-Keokea New Park Development (PCDP 3.5.lb) <br /> The FY 2013-14 CIP Budget included $1.5 million for the planning, engineering & <br /> design of infrastructure improvements, new buildings or structures at the proposed <br /> Kikala-Ke6kea Beach Park. <br /> 7. Complete Development of Ahalanui Beach Park (PCDP 3.5.3b. <br /> The FY 2013-14 CIP Budget included $1.25 million for the planni*, ngineering & <br /> design of infrastructure improvements, new buildings or structures pertaining to the <br /> development of permanent restroom facilities alan ' each Park. <br /> 8. Create a safe swimming area at Pohoiki Coastal Park(PCDP 3.5.3b.2) <br /> The FY 2013-14 CIP Budget inc Id $40,000 for a feasibility study and preliminary <br /> planning to develop a safe swimm at Isaac Hale Beach Park. <br /> 9. Glenwood Park Improvement (PC P 3.5.3cl)c) <br /> AC Champion effort to initiate actions to address safety concerns related to the existing <br /> Glenwood Park alongside Hwy. 11. <br /> 10. Improve and expand Pahoa Regional Park(PCDP 3.5.3c.2) <br /> Support the improvement and expansion of the Pahoa Park and collaboration between the <br /> Department of Parks and Recreation and the Pahoa Regional Town Center Master Plan <br /> Subcommittee. <br /> 11. Mountain View Village Community Center & Playground Project (PCDP 3.5.3c.6) <br /> AC Champion and community-based group worked with Parks & Recreation to acquire <br /> and install keiki playground equipment at Mt. View Gym. The FY 2013-14 CIP Budget <br /> included $200,000 for re-roofing and new gutters& down spouts at the Mt. View Gym. <br /> 12. Management Plan for Wai`opae Marine Life Conservation District (PCDP 3.5.3.e.2) <br /> Application submitted to the Public Access Open Spaces and Natural Resources <br /> Preservation Commission for acquisition of 322+ acres south of Vacationland Hawaii <br /> subdivision and adjacent to the Wai`6pae Marine Life Conservation District. <br /> 13. Establish connecting pedestrian, bicycle, and slow-speed road routes among Makai <br /> subdivisions <br /> A. HWY 132 (PCDP 3.5.3d.1) <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.