Laserfiche WebLink
EXHIBIT B <br />SOLID WASTE NIAN; GENIF.N "r PLAN <br />F0 11 <br />t) 11Cll I11)LAN1) T11. \1)E CEN,rrii <br />T! i K: 1 -6 -010: 083 <br />I'll i's document in comIlliance (h (he County oI' I I:j i Department of 1'11V iroEUticjjt;tl <br />1lanngcment will outline all respunsihilities ol*the Developer mid Contractor during the <br />coEtstrt €ction oft)rchidlaiad I'rade Center site devclopinenl. <br />I. Description or nroiect• <br />A) the Proiect consists of five new commercial retail btjildiilgs, each with space <br />available for multiple tenants. The five new commercial buildit:gs cover a total <br />area of 24.000 square teet. The site will also include parking lot improvements. <br />electrical lighting, shallow drywells to capture any un -site storm water discharge, <br />waterline and storm drain line trenching, and individual waste water systems. <br />B) The potential solid waste that may be generated from the site during construction <br />would be as follows: left over wire mesh, A.C. pavement, concrete, PVC pipe, <br />excess material from grading and excavation, and other consumable products such <br />as cardboard. it is anticipated that the site grading volumes will balance with <br />2.020 cubic yards of import construction material, including base rock, asphalt, <br />and concrete. <br />C) The potential solid waste that may be generated from the site during normal <br />operation would be as follows: paper, rood, plastic, waste cooking oil and other <br />consumable products such as cardboard. It is anticipated that there will be 20 <br />cubic yards or waste per week. <br />D) All small amormts green waste, such as leaves and sticks wilt be left on tale land <br />for decomposing and reused for landscaping maintenance ptu•poses. Large <br />amounts orgreen waste, such as trees. will be hauled away and disposed orat the <br />proper disposal location. <br />2. Onsite Source Senarition <br />A) Ally excess material from grading operations, suitable to be used for construction <br />till, will be screened and crushed to proper size. Excess green waste, unsuitable to <br />he used forconstruction, will be hauled any from site. Contractor will set aside <br />arty excess construction material with salv;tge value. for recycling. <br />