Laserfiche WebLink
A traffic analysis impact report has been prepared by Witcher Engineering LLP. Copies <br />of this report have been provided to County of Hawaii, Planning Department with the <br />Change of Zone Request Application. <br />The Traffic Impact Analysis report in it's conclusion, states that the intersection of <br />Highway 130 and Orchidland Drive is already impacted. The levels of service are "E" <br />(very long traffic delays) in the AM and "F" (extreme traffic delays) in the PM. <br />The TIAR further states that mitigating measures need to be put in place for this already <br />impacted intersection. These mitigating measures could consist of more lanes on Highway 130, <br />a right turn lane on Orchidland Drive with traffic signals, or a roundabout may also be a solution. <br />Neither 130 Holdings LLC or the Hawaii State Department of Highways have no proposed solution <br />to mitigating the already impacted intersection. <br />L. Availability of Utilities: <br />Applicant has entered into an agreement with Orchidland Gulsons LLC, to connect <br />to their existing waterline and construction plans have been approved meeting with <br />Department of Health and Fire Department requirements. Subterranean waterlines <br />have been installed within the property. The two existing buildings have been stubbed <br />for water. <br />Overhead electric is available from the Hawaii Electric Light Company. <br />To the best of our knowledge, telephone services (landline and cellular) are currently <br />available to the property. <br />A solid waste management plan has been prepared by Engineering Partners, Inc., a <br />copy of which is attached as Exhibit B. <br />4 <br />