My WebLink
|
Help
|
About
|
Sign Out
Home
2015-2 REZ 14-184 and SLU 14-41
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2015
>
2015-2 REZ 14-184 and SLU 14-41
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 10:20:00 AM
Creation date
1/7/2015 10:14:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A traffic analysis impact report has been prepared by Witcher Engineering LLP. Copies <br />of this report have been provided to County of Hawaii, Planning Department with the <br />Change of Zone Request Application. <br />The Traffic Impact Analysis report in it's conclusion, states that the intersection of <br />Highway 130 and Orchidland Drive is already impacted. The levels of service are "E" <br />(very long traffic delays) in the AM and "F" (extreme traffic delays) in the PM. <br />The TIAR further states that mitigating measures need to be put in place for this already <br />impacted intersection. These mitigating measures could consist of more lanes on Highway 130, <br />a right turn lane on Orchidland Drive with traffic signals, or a roundabout may also be a solution. <br />Neither 130 Holdings LLC or the Hawaii State Department of Highways have no proposed solution <br />to mitigating the already impacted intersection. <br />L. Availability of Utilities: <br />Applicant has entered into an agreement with Orchidland Gulsons LLC, to connect <br />to their existing waterline and construction plans have been approved meeting with <br />Department of Health and Fire Department requirements. Subterranean waterlines <br />have been installed within the property. The two existing buildings have been stubbed <br />for water. <br />Overhead electric is available from the Hawaii Electric Light Company. <br />To the best of our knowledge, telephone services (landline and cellular) are currently <br />available to the property. <br />A solid waste management plan has been prepared by Engineering Partners, Inc., a <br />copy of which is attached as Exhibit B. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.