My WebLink
|
Help
|
About
|
Sign Out
Home
2017-6 PCDP Action-Objective table
PublicDocuments
>
Planning Department
>
Action Committees (AC)
>
Puna Community Development Plan Action Committee
>
Pre-2018 Files
>
Communications to AC
>
2017
>
2017-6 PCDP Action-Objective table
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 8:51:13 AM
Creation date
2/3/2017 8:50:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCDP Objective and Action Alignment Table <br />I <br />Roadway Network <br />4.3.2.a <br />County Action <br />Create alternative, redundant routes for existing Highways 11, 130 and 132 utilizing existing routes <br />O <br />wherever possible. <br />4.3.2.b <br />County Action <br />Develop PMAR along the general route shown in Figure 4-1, with the specific design and alignment <br />O <br />• Need a Puna makai alternate <br />to be determined based on an environmental impact study that identifies a project having the <br />route (PMAR), widening of 130, <br />least environmental and socio-economic impact. <br />more jobs and services within our <br />communities. Revamp bus system. <br />Puna is underserved by State. <br />• HPP connectivity. Issues with <br />puna makai thru HPP alignment <br />proposals. Go mauka of HWY 130 <br />so no takings of land for alternative <br />routes. Use micro economic zones, <br />4.3.2.c <br />County Action <br />Designate new connectivity points for local traffic and emergency and evacuation routes within <br />O <br />• Puna <br />Need for transportation to go to <br />the existing roadway network. <br />Connectivity <br />medical appointments, maintaining <br />Routes: Ord. <br />recreational facilities. <br />16-73 <br />Infrastructure is needed and <br />Lapse: June <br />expensive. Need better <br />30, 2019 <br />connectivity & emergency <br />response. <br />4.3.2.d <br />County Action <br />Develop a phased implementation plan for coordinated actions by County and State transportation <br />O <br />14.3.2.e <br />and public works departments. <br />County Action <br />Improve appropriate "roads in limbo' that are used widely for public access. <br />O <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.