My WebLink
|
Help
|
About
|
Sign Out
Home
2017-06-16 Letter to Suzanne Case re Inspections of Uncle Billy's
PublicDocuments
>
Office of the Mayor
>
Office of the Mayor Documents
>
2016-2020
>
Correspondence
>
2017
>
06-2017
>
2017-06-16 Letter to Suzanne Case re Inspections of Uncle Billy's
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 2:59:35 PM
Creation date
6/16/2017 12:50:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
352.44 Expansion Fittings. Expansion fittings for PVC <br />Conduit shall be provided to compensate for thermal expansion <br />And contraction where the length change, in accordance <br />With Table 352.44, is expected to be 6 mm (1/4 in.) or greater in <br />A straight run between securely mounted items such as boxes, <br />Cabinets, elbows, or other conduit terminations. <br />358.24 Bends — How Made. Bends shall be made so that <br />The tubing is not damaged and the internal diameter of the <br />Tubing is not effectively reduced. The radius of the curve of <br />Any field bend to the centerline of the tubing shall not be <br />Less than shown in Table 2, Chapter 9 for one-shot and full <br />Shoe benders. <br />358.26 Bends — Number in One Run. There shall not be <br />More than the equivalent of four quarter bends (360 degrees <br />Total) between pull points, for example, conduit bodies and <br />Boxes. <br />358.30 Securing and Supporting. <br />(A) Securely Fastened. EMT shall be securely fastened in <br />Place at least every 3 m (10 ft.). In addition, each EMT runs <br />Between termination points shall be securely fastened within <br />
The URL can be used to link to this page
Your browser does not support the video tag.