My WebLink
|
Help
|
About
|
Sign Out
Home
General Requirements and Covenants (2)
PublicDocuments
>
Public Works
>
Administration Division
>
99_Archive
>
02_Bid Information
>
Documents
>
General Requirements and Covenants (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2018 1:51:15 PM
Creation date
12/11/2017 12:59:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />If upon final inspection, the Engineer declares the project satisfactorily <br />completed and accepts the work, the date of completion will be established by <br />the Engineer as the date on_which the Contractor notified the Engineer in <br />writing that the project was ready for the final inspection, after which no <br />working days will be charged against the contract time, and the Contractor <br />shall be so notified. <br />Section 5 <br />Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.