Laserfiche WebLink
• <br />• <br />If upon final inspection, the Engineer declares the project satisfactorily <br />completed and accepts the work, the date of completion will be established by <br />the Engineer as the date on_which the Contractor notified the Engineer in <br />writing that the project was ready for the final inspection, after which no <br />working days will be charged against the contract time, and the Contractor <br />shall be so notified. <br />Section 5 <br />Page 25 <br />