Laserfiche WebLink
Jan 2018 6,510.36 10,134.36 <br />Feb 2018 5,730.29 9,517.57 <br />Mar 2018 6,702.33 11,387.65 <br />Apr 2018 5,933.86 15,030.98 <br />May 2018 6,028.33 17,994.44 <br />Jun 2018 <br />Totals 68,857.78 131,546.13 <br /> <br />WASTEWATER DIVISION PROJECTS AND UPDATES <br />1. COMPLIANCE <br />• TREATMENT AND DISPOSAL: No report. <br />• COLLECTION SYSTEM: No report. <br /> <br />2. OPERATIONS <br />A. TREATMENT/COLLECTION SYSTEMS AND PUMPING STATIONS/ <br />FORCE MAINS: <br />• Unscheduled repairs/upgrades/replacement of failing equipment due to age and <br />prolonged wear and tear continue where necessary throughout the wastewater <br />facilities. <br />B. SAFETY PRACTICES/TRAINING: <br />• WWD Administration continues to review and update the Emergency <br />Response Procedures and the Standard Safety Procedures. Reviewing and <br />updating weekly safety meeting agendas. <br /> <br />3. ADMINISTRATION <br /> A. VACANT POSITIONS IN OPERATIONS: <br />• Sewer Maintenance Working Supervisor (Hilo): Interviews have been <br />conducted. <br />• Trades Helper (temporary, Hilo – 2 positions): recruitment in progress. <br />• Operator II (Hilo): requesting reallocation to Operator IV. <br />• Wastewater Treatment Plant Supervisor IV (Hilo): recruitment in progress. <br />• Assistant Operator (Hilo – 3 positions): recruitment in progress. <br />• Assistant Operator (Kona – 1 position): recruitment in progress. <br />• Sewer Maintenance Repairer (Kona): Interviews have been conducted. <br />• Wastewater Treatment Plant Supervisor III (Kona): recruitment in progress. <br /> <br />B. VACANT POSITIONS AT RAILROAD OFFICE: <br /> Engineering Support Tech IV: recruitment in progress. <br /> Civil Engineer IV: Interviews have been conducted. <br /> Engineering Student: requesting reallocation to Env. Eng. III. <br /> Student Helper I: requesting reallocation to Env. Eng. III. <br /> <br /> <br />7 <br /> <br />