Laserfiche WebLink
2018 <br />2018-10.01 <br />Status <br />No. <br />Communication <br />creational, <br />Pule Highway <br />- <br />he Kawaihae area <br />Community <br />Intended Impact of <br />Provide additional water sources that can provide for more commercial, residential, re and industrial uses in the area. Identify the best strategy or strategies to help clean up <br /> Pelekane Bay. Increase traffic safety along Akoni through t and encourage pedestrian friendly streets. <br />- <br />(Corps <br />Estimated Cost <br />$10,000,000 to $20,000,000 Feasibility Studies $500,000 to $2,000,000 of Engineers to cover 50% of the costs) Design and Construction costs Unknown at this time) Costs to the <br /> State will entail new signage and administrative expenses. These should be minimal costs. <br />ina Lea <br />Implementers <br />Bridge LLC with assistance from DWS and possibly DHHL DOT; COE, CDPAC, Kawaihae community DOT <br />4 6 7 <br />2 <br />No. 1 12 12 <br />Page <br />AN <br />area in order <br />Pule Hwy. in the <br />Action/ Strategy <br />Complete the development of the Ouli Well Field and transmit the water from Ouli to the Kawaihae to provide additional sources of potable water for the area Move forward with feasibility <br /> studies to examine alternative strategies to improve marine water quality along the coast Reduce the speed limit from 35 mph to 25 mph along Akoni vicinity of Kawaihae Harbor <br /> as indicated on the Conceptual Plan Map <br />1.1 2.1 3.1 <br />No. <br />KAWAIHAE COMMUNITY PL <br /> <br />