Laserfiche WebLink
2018 <br />2018-10.01 <br />Status <br />No. <br />and <br />Communication <br />ape route that <br />Community <br />Intended Impact of <br />ahumanu Hwy. <br />Protect the Puak community from wildfires that start along Queen Ka An improved early alert warning system that will save lives A second esc will increase the safety and welfare <br /> of coastal residents in the area. Reduce pollution entering the waters off of Puak improve marine water quality <br />costs <br />- <br />Estimated Cost <br />$120,000 $240,000 Less than $80,000 $70,000 $5,000,000 to $10,000,000 Including additional future operation and maintenance <br />Community <br />Implementers <br />DPW, PD, CCD, DLNR, CDPAC CCD, SCD, DPW, PD, CDPAC Puak Association; PD DEM, PD, CDPAC <br />2 3 4 5 <br />No. 14 14 14 14 <br />Page <br />Beach <br />Highway <br />ahumanu <br />Road <br />electrical power <br />Action/ Strategy <br />Establish a fuel break along Queen Ka and the northeastern section of Puak Upgrade existing emergency warning sirens to have a battery backup in case of power outages Construct <br /> the Paniau Evacuation Route Construct a sanitary sewer system for the Puak Lots <br />1.1 1.2 1.3 2.1 <br />No. <br />