Laserfiche WebLink
MCCOLLOUGH: It’s, it’s the house on the property, which they— <br /> <br />CARR SMITH: It’s in the house— <br /> <br />MCCOLLOUGH: —refer to as a farm dwelling. <br /> <br />CARR SMITH: —okay, okay, all right. So, you’re not going to put a bathroom in the shop? <br /> <br />MCCOLLOUGH: It would be too much for us to have to do a septic system— <br /> <br />CARR SMITH: Oh, okay. <br /> <br />MCCOLLOUGH: —and so it’s easier just to let them use that one. <br /> <br />CARR SMITH: Thank you. <br /> <br />UNGER: Mr. Yee? <br /> <br />YEE: Michael Yee, Planning Director. I want to clarify that the rub isn’t so much with the <br />inspection station. As you heard, when there was a complaint, typical, we will allow, if we have a <br />willing applicant to come in and wants to fix things, we’re generally okay with that. I think as we <br />dwelt back into this and realized they had an unpermitted structure of many years, I think that’s <br />more the issue in the Condition 4, which is trying to reach the Final Plan Approval and building, <br />electrical, and plumbing permits. <br /> <br />And, so, there’s a life/safety issue here. That’s what DPW and building permits, that’s their area, <br />and without knowing that they have those permits, then there’s a question, and it’s not upon <br />Planning to make sure that building is safe. I wouldn’t say it’s necessarily odd that in the <br />Planning, you know, condition that we include, you know, we often say you have to be consistent <br />with, with all laws, but given the history on this, we want it to be clear that they needed to get <br />permits from DPW. So, I think that’s the crux of the language that I have in Number 4. <br /> <br />You know, I guess the question to the applicant would be, if you haven’t gone in for permits for so <br />many years, what’s going to motivate you now to do it. So, I guess that’s the question. <br /> <br />TRIANTOS: If I may, we do have the Conditions 5 and 6— <br /> <br />SAUER: Excuse me— <br /> <br />HALL: Please speak into the microphone. <br /> <br />SAUER: Thank you. <br /> <br />TRIANTOS: We do have Conditions 5 and 6, which do require us to get the permits and to get, <br />I’m sorry, get Final Plan Approval and then permits, just like they talked about the, what comes <br />10 <br />EXHIBIT B <br /> <br />