Laserfiche WebLink
first, the egg, or the chicken or the egg. So, we do have those conditions already in the materials, <br />in the application, in the conditions. <br /> <br />UNGER: And that’s a one-year extension. Is that correct? <br /> <br />TRIANTOS: That’s correct. <br /> <br />UNGER: Or one-year time, timeframe? <br /> <br />TRIANTOS: That is correct. <br /> <br />UNGER: Oh, okay, okay. Yeah, understood. <br /> <br />VITOUSEK: So, in that case, you know, when you have this condition already in place to require <br />the permitting of these buildings, I mean, and if the safety inspection isn’t really, you know, the <br />major rub there, then I personally wouldn’t see a problem with allowing the inspection station to <br />continue subject to the applicant’s proposed condition where they have to get approval from the <br />State Department of Transportation. <br /> <br />UNGER: Yeah, we can certainly continue that discussion once a motion gets on the table, but, but <br />certainly up for discussion. And, any other questions for the applicant at this time? Carr Smith? <br />Commissioner Carr Smith? <br /> <br />CARR SMITH: I have to follow up with my question about the stored fuel. Is that a part of your <br />permit? <br /> <br />MCCOLLOUGH: So, we don’t store fuel, and when they came out, they confirmed that we don’t <br />take fuel out of vehicles. <br /> <br />CARR SMITH: All right. Very good. And, can you just tell us what your plans are timing wise <br />on that year? Where you are in the process of submitting your plan and your intentions? <br /> <br />MCCOLLOUGH: So, we have an architect who has actually drawn everything up, and my <br />associate, his associate, Katherine, is handling the permit right now. We’re going through the <br />processes of doing it. It’s, trying to do an “as built” is a lot harder than trying to get a permit for <br />something that’s new. I didn’t know it was going to be that difficult and take that long. That’s <br />why we’re asking for the extension. And, just so you know, I, this is the first time, when I got this <br />last permit, that it’s been required that I permit the building. It’s never been a condition in any of <br />the other permits. So, I, from 2004, it was never a condition that I permit it and change the usage. <br />This is the first time it’s ever happened. <br /> <br />VITOUSEK: Did the County know about the size of the building when they came here in 2017? <br />And the permitting issues then? <br /> <br />JACKSON: Yes, that’s why we recommended adding Condition 5 and 6. <br /> <br />11 <br />EXHIBIT B <br /> <br />