My WebLink
|
Help
|
About
|
Sign Out
Home
2018-10-18 Leeward Exh B (AMEND SPP 1247)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2018
>
2018-10-18 Leeward Exh B (AMEND SPP 1247)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2018 10:28:38 AM
Creation date
12/12/2018 10:28:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
first, the egg, or the chicken or the egg. So, we do have those conditions already in the materials, <br />in the application, in the conditions. <br /> <br />UNGER: And that’s a one-year extension. Is that correct? <br /> <br />TRIANTOS: That’s correct. <br /> <br />UNGER: Or one-year time, timeframe? <br /> <br />TRIANTOS: That is correct. <br /> <br />UNGER: Oh, okay, okay. Yeah, understood. <br /> <br />VITOUSEK: So, in that case, you know, when you have this condition already in place to require <br />the permitting of these buildings, I mean, and if the safety inspection isn’t really, you know, the <br />major rub there, then I personally wouldn’t see a problem with allowing the inspection station to <br />continue subject to the applicant’s proposed condition where they have to get approval from the <br />State Department of Transportation. <br /> <br />UNGER: Yeah, we can certainly continue that discussion once a motion gets on the table, but, but <br />certainly up for discussion. And, any other questions for the applicant at this time? Carr Smith? <br />Commissioner Carr Smith? <br /> <br />CARR SMITH: I have to follow up with my question about the stored fuel. Is that a part of your <br />permit? <br /> <br />MCCOLLOUGH: So, we don’t store fuel, and when they came out, they confirmed that we don’t <br />take fuel out of vehicles. <br /> <br />CARR SMITH: All right. Very good. And, can you just tell us what your plans are timing wise <br />on that year? Where you are in the process of submitting your plan and your intentions? <br /> <br />MCCOLLOUGH: So, we have an architect who has actually drawn everything up, and my <br />associate, his associate, Katherine, is handling the permit right now. We’re going through the <br />processes of doing it. It’s, trying to do an “as built” is a lot harder than trying to get a permit for <br />something that’s new. I didn’t know it was going to be that difficult and take that long. That’s <br />why we’re asking for the extension. And, just so you know, I, this is the first time, when I got this <br />last permit, that it’s been required that I permit the building. It’s never been a condition in any of <br />the other permits. So, I, from 2004, it was never a condition that I permit it and change the usage. <br />This is the first time it’s ever happened. <br /> <br />VITOUSEK: Did the County know about the size of the building when they came here in 2017? <br />And the permitting issues then? <br /> <br />JACKSON: Yes, that’s why we recommended adding Condition 5 and 6. <br /> <br />11 <br />EXHIBIT B <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.