My WebLink
|
Help
|
About
|
Sign Out
Home
2019-03-07 Hearing Transcript - Wailani Development, LLC Amend REZ 10-117
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2019
>
2019-03-07 Hearing Transcript - Wailani Development, LLC Amend REZ 10-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2019 3:13:59 PM
Creation date
4/4/2019 3:13:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Applicant is also requesting to deleteI'm sorry, I think, there we go—to delete <br />Condition N, which stated that all project utilities shall be underground, as well as a request to <br />amend Condition L. The change to Condition L essentially is to grant additional time for them to <br />start and complete construction of the development. The condition originally required that they <br />start within five years of the effective date of the ordinance, and they are requesting another <br />extension, another five-year time extension to commence construction. <br />The other component that's revised in Condition L is to delete the timing for commencing <br />construction and completing construction of the Ponahawai Street Extension, and then to require <br />various traffic improvements as the project is developed out by individual developers over time. <br />The request to amend Condition P is related to how Ponahawai Street Extension is improved. <br />The Applicant is requesting—actually what I'd like to do rather than go into depth on this <br />amendment is to discuss the Applicant's current amendment. You should have received a sheet <br />in your package today that says, "Applicant's Proposed Amendments" and they're now <br />requesting to further amend Condition P. Their current request is to provide an 80 -foot right-of- <br />way and to pave the entire length of the Ponahawai Street Extension out to the 80 -foot right-of- <br />way limit. That would provide travel lanes as well as paved swales and shoulders, except for the <br />portion closest to Komohana Street, they're proposing to put in curb, gutter, sidewalk along that <br />area, and I'll show you when I get to the map. And, then the second component of their revision <br />to Condition P is to dedicate those improvements, the extension to the County, and to complete <br />those improvements within ten years of the effective date of the ordinance, of the amended <br />ordinance. <br />Condition Q, this request was to allow for direct access from the site to Komohana Street and <br />Mohouli Street. These are considered arterial roadways, and the Applicant wanted to be able to <br />have a driveway access onto these roadways. Currently, the condition limits direct access from <br />the project site onto these roadways except for road lots rather than driveways. <br />Condition R, again on the sheet that we handed out to you today, the Applicant has further <br />requested to revise Condition R, so I'm going to focus on what was handed out today. The gist <br />of the proposal is to have them provide, they're willing to provide curb, gutter, sidewalk <br />improvements near any of the commercial development, but they're proposing not to have curb, <br />gutter, sidewalk improvements on single-family residential lots that are greater than 10,000 - <br />square feet in size. <br />And, Condition KK would be to not apply the fair -share assessment to any housing units <br />constructed within the project site that are required to meet the affordable housing requirements <br />of the County Code. <br />And, then lastly, the amendment to Condition 00 will just be to allow for another administrative <br />time extension provided by the Planning Director of an additional five to ten years, depending on <br />the condition for a roadway improvement. <br />The Applicant's reasons for request, they are being sought because develop—excuse me, they're <br />being sought to make the Wailani Project District project financially feasible by reducing some <br />EXHIBIT C <br />3 <br />