My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND REPORT (PL-SPP-2022-000010)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2022
>
2022-06-02 Windward
>
Item #1 Stephanie Bath (PL-SPP-2022-000010)
>
PD BACKGROUND REPORT (PL-SPP-2022-000010)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2022 2:51:05 PM
Creation date
5/25/2022 2:49:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MathSPP.5.6.2022 <br /> COUNTY OF HAWAI`I PLANNING DEPARTMENT <br /> BACKGROUND REPORT <br /> ROY AND STEPHANIE BATH <br /> SPECIAL PERMIT APPLICATION NO. PL-SPP-2022-000010 <br /> ROY AND STEPHANIE BATH are requesting a Special Permit to allow a home occupation <br /> for a massage therapy establishment on approximately 5,720 square feet of a larger three (3) acre <br /> property in the State Land Use Agricultural District. The subject property is located at 16-2059 <br /> Moho Road, approximately 0.37 miles from its intersection with Ale Road, Hawaiian Acres, <br /> Kea`au, Puna, Hawaii, TMK: (3) 1-6-045:007. <br /> APPLICANT'S REQUEST <br /> 1. Request: The applicants are requesting a Special Permit to allow a home occupation for a <br /> massage therapy establishment within a 68.8 square foot portion of an existing single- <br /> story, 688-square foot dwelling under construction on the subject property. The dwelling <br /> consists of two (2) bedrooms, one (1) bathroom, living room, kitchen,plus a 96-square <br /> foot covered lanai. The applicants are proposing to convert the smaller, 68.8-square foot <br /> bedroom into the area for the massage therapy home occupation use. Other components <br /> of the project include the existing driveway and a proposed parking area, for a total 5,720 <br /> square foot permit area. <br /> 2. Staffing/Employees: The applicants do not intend to hire employees. <br /> 3. Hours of Operation: According to the applicants, visits will be conducted by <br /> appointment between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. <br /> Saturday appointments will occasionally be scheduled, to accommodate those unable to <br /> schedule during weekday business hours. <br /> 4. Clients: The applicants anticipate approximately 0-5 clients per day. <br /> 5. Construction Timetable: The applicants intend to complete the permitting process for <br /> the proposed home occupation by August of 2022. <br /> 6. Supportive Information: The applicants have submitted the attached in support of <br /> the request: (Planning Department Exhibit 1 — Special Permit Application received <br /> January 31, 2022 and Supplemental Information received February 18 and <br /> February 24, 2022). <br />
The URL can be used to link to this page
Your browser does not support the video tag.