Laserfiche WebLink
BKaneshiroREZ.cm.8.14.23 <br /> COUNTY OF HAWAI`I PLANNING DEPARTMENT <br /> BACKGROUND REPORT <br /> SANDRA KANESHIRO <br /> CHANGE OF ZONE APPLICATION NO. PL-REZ-2023-000046 <br /> SANDRA KANESHIRO has submitted an application for a Change of Zone from an <br /> Agricultural-3 acres (A-3a)to a Family Agricultural-1 acre (FA-la) zoning district for 3.16 acres <br /> of land. The subject property is located at 605 Makalika Street, approximately 540 feet southwest <br /> (mauka) of its intersection with Railroad Avenue, Panaewa Farm Lots, South Hilo, Hawaii, <br /> TMK: (3)2-2-048:092. <br /> APPLICANT'S REQUEST <br /> 1. Applicant's Request: The applicant is requesting a Change of Zone from an <br /> Agricultural-3 acres (A-3a) to a Family Agricultural-1 acre (FA-la) for 3.16 acres of <br /> land. The FA-la zoning district, with a minimum lot size of 1 acre, would allow a <br /> maximum density of 3 lots. The Family Agricultural zoning district provides for a blend <br /> of small-scale agricultural operations associated with residential activities and which may <br /> be characterized by farm estates, small acreage farms, or subsistence lots and is intended <br /> to be in areas designated as being within the State land use agricultural district. <br /> Requirements for establishing land uses in the Family Agricultural zoning district, <br /> including a list of the variety of permitted land uses, are shown in Section 25-5-60 to 67 <br /> of the Zoning Code. (Planning Department Exhibit 1 — Zoning Code Requirements <br /> for Family Agricultural Districts) <br /> 2. Purpose for the Request: The primary purpose of the request is to subdivide the <br /> property into two lots, at a minimum of 1.4 acres each, to establish fee-simple ownership <br /> of the property. The property currently consists of two existing single-family dwellings, <br /> one of which is an approved `ohana dwelling. No additional improvements to the subject <br /> property are currently being proposed by the applicant. <br /> 3. Construction Timetable and Cost: The subdivision process will begin immediately <br /> after the rezoning request is approved. The applicant anticipates the subdivision to be <br /> approved within 3 years of the requested rezone approval. The cost associated with the <br /> -1- <br />