My WebLink
|
Help
|
About
|
Sign Out
Home
2012-06-15 Report of Change Orders Authorized
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Authorized Change Orders Reports
>
2012
>
2012-06-15 Report of Change Orders Authorized
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2012 12:49:18 PM
Creation date
7/11/2012 12:49:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REPORT OF CHANGE ORDERS AUTHORIZED <br />FOR THE PERIOD OF: 6/1/12-6/15/12 <br />Legend: <br />Change Order <br />CO <br />Supplemental Agreement <br />SA <br />Professional Services <br />PS <br />Construction <br />C <br />Price Term Agreement <br />PTA <br />Other Goods & Services <br />GS <br />OriginalOriginal % ofCumulative% of <br />ExecutionJob Contract ProjectContractDept.ContractContractCO/SACO/SAOrigCO/SAOrigContractorProjectProjectPurpose <br />Date##TitleTypeAmountDateNo.AmountContTotalContManagerStatus <br />Ane Keohokalole Hwy, <br />Ben Ishii, Bio-retention basins must be installed <br />Hina Lani Street to <br />Engineering based on the environmental <br />6/13/2012P-3944C.002698CDPW$29,893,336.762/22/201017$128,557.860.43%$4,678,648.5115.65%Nan, Inc.Open <br />Palani Rd. FAP No. <br />Div.assessment. <br />ARR-1880(1) <br />Modify Scope of Work to relocate <br />Naalehu and Pahala <br />Wastewater Treatment Plant in <br />Fukunaga & <br />Wastewater Collection <br />6/14/2012N/AC.001454PSDEM$971,350.0010/11/20072$239,483.0024.65%$461,910.0047.55%Lyle HirotaOpen <br />Associates, Inc.Naalehu due to the identification of <br />& Treatment System <br />significant archeological sites in area. <br />Supplemental agreement for an <br />Kalapana Lava Viewing Jan-Guard Gilbert <br />additional 90 day extension period <br />6/14/2012RFP-2657C.002995GSParks$145,848.9812/15/20104$65,670.5745.03%$328,351.71225.13%Open <br />ServiceHawaii IncBenevides <br />while new specification and bid <br />completed. <br />JM Consulting <br />RFP-Health and Educational Pauline Option year extension from (6 month <br />6/13/2012C.003274GSAging$55,000.009/6/20111$0.000.00%$0.000.00%Open <br />Services <br />103FServicesFukunagaextension only at this time). <br />Planning, Design and <br />Isemoto <br />Casey <br />Construction of Island <br />Contracting Co. <br />6/13/2012E-4066BC.003315CDPW$599,000.0010/10/20111$0.000.00%$0.000.00%OpenNumber of working days increased. <br />Yanagihara <br />Wide Bus Stops and <br />Ltd. <br />Shelters, Part B <br />Planning, Design and <br />Isemoto <br />Casey <br />Construction of Island <br />Contracting Co. <br />6/13/2012E-4066AC.003314CDPW$397,100.0010/10/20112$0.000.00%$5,817.391.46%OpenNumber of working days increased. <br />Yanagihara <br />Wide Bus Stops and <br />Ltd. <br />Shelters, Part A <br />David <br />Engineering Services Add electrical engineering services <br />Engineering <br />Yamamoto, <br />for DPW Facilities for coordination with mechanical <br />6/14/2012B-3831C.001420PSDPW$47,100.008/27/20071$20,230.0042.95%$20,230.0042.95%Open <br />Partners Inc <br />Building <br />Mechanical Systems.system design. <br />Division <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.