My WebLink
|
Help
|
About
|
Sign Out
Home
2025-05-12 Steve Poludniak Kazi Group of Companies Testimony
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2025
>
2025-05-15 - Leeward
>
Item #1 Boaz LLC (PL-SMA-2025-000072)
>
2025-05-12 Steve Poludniak Kazi Group of Companies Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 8:05:29 AM
Creation date
5/13/2025 8:05:28 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
5/12/2025
Permit Number
PL-SMA-2025-000072
Parcel Number
750200210000
Description
Email testimony
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From: Steve Poludniak <br /> To: LPCtestimonv <br /> Subject: Testimony for Notice of Submittal of Application and Planning Commission Hearing for Special Management Area <br /> Use Permit(PL-SMA 2025-000072) <br /> Date: Monday,May 12,2025 9:58:31 AM <br /> Dear Madam or Sir: <br /> This is Kazi Family Hawaii, LLC's, located at 75-6081 Ali'i Drive, Unit 4R203, Kailua-Kona, <br /> HI 96740, testimony addressed to the Commission for the hearing scheduled for May 15, 2025 <br /> for the above captioned Permit. <br /> 1. Will there be any roadway barricades and where will they be placed from the Ali'i Lani <br /> community condominiums ("Location")? <br /> 2. Will there be construction vehicles dedicated to the construction passing by the Location? <br /> If so, how much more than from the time before the construction begins? Will this cause <br /> congestion of traffic in front of the Location? <br /> 3. Will there be an increase in noise or repetitive noise, like pounding, construction trucks or <br /> the like, that can be heard at the Location? <br /> 4. Will there be any major dirt or dust issues across the Location? <br /> 5. Will there be any blockage of any of the Location entrances or exits for any period of time <br /> due to the construction? <br /> 6. Please send us a video of the surrounding area, including the Location and the <br /> construction area showing both sides of the street. <br /> 7.What is the planned construction schedule from the date this Special Permit is issued <br /> to the completion of the construction, and how will it affect the Location as to access <br /> during daily hours? Who will update this schedule on a weekly basis? <br /> 8. Will there be road closures or detours around the Location? <br /> 9. Will there be phases of work stoppage? For what reasons and when? <br /> 10. Will construction equipment be parked at or near the Location for any reason? <br /> Explain those reasons. <br /> 11. What will be done to mitigate dust, dirt, and debris from the construction site? <br /> 12. Will there be any changes to parking availability or access to the Location at any time <br /> during the construction? <br />
The URL can be used to link to this page
Your browser does not support the video tag.