Laserfiche WebLink
eliminate Contractor Change Orders. Manage over thirteen Consultant <br />Agreements for various public works projects within Kern County. Establish <br />training procedures and policies for staff members. Promoted Total Quality <br />Management (TQM) and reengineering through innovation and teamwork. <br />Implement design creativity and innovations that resulted in placement of Waste <br />Management Department as the first candidate in line for the acceptance of an <br />alternative design for closure and landfill liners. <br />May 1990- Oct. 1992 Project Manager/Resident Engineer <br />Public Works Department, Kern County <br />Oversee Public Works construction projects that include but are not limited to, <br />Landfills, Bridges, Sewer Systems, Water Systems, Roads, Concrete Structures, <br />Drainage Systems, Transfer Stations, Contract Change Orders, Contract <br />Administrations, Project Scheduling and Management. <br />Aug. 1987- May 1990 Assistant Director <br />Engineering Department <br />Land Concepts, Inc. <br />Lancaster, California <br />Manage and supervise the activities of the engineering department which <br />included client marketing and acquisition, Soliciting engineering public works, <br />and networking with public officials for approval of private projects/developments. <br />Oversee the design of major subdivisions, flood studies, parcel maps and private <br />and public infrastructure. Manage and direct the engineering staff and distribute <br />assignments. Schedule, plan, and provide quality assurance for major residential, <br />commercial and Industrial projects to ensure deliverables are on time and within <br />budget. Ensure Client satisfactions through collaboration, performance, and <br />diplomacy. <br />Sep. 1985- Aug. 1987 Project Engineer <br />Rickett, Wards, Delmarter & Diefel <br />Bakersfield, California <br />Design and draft subdivision maps, tract maps, parcel maps, sewer, water, <br />drainage, flood studies, grading, and street improvement plans. Performed <br />Structural calculations and operated the first version of AutoCad. Managed the <br />project budget to ensure all projects were completed on time and maintained <br />within the profitability margin. <br />References - Readily provided upon request <br />