Laserfiche WebLink
West Hawaii Business Park LLC Request to Amend Ord. No. 18-115 <br /> July 15, 2021 <br /> Page No. 11 <br /> 2-46{d'}. On July 12, 2021, tl OC provided a letter confirming that "with the <br /> implementation of the recommendations, traffic operations at the study intersections are <br /> generally expected to continue operating at levels of service similar to without project <br /> conditions. Therefore, the recommendations and conclusions of the TIR co-1tinue to be <br /> valid and implemented A copy of the WOC letter is included as Exhibit 6, <br /> The TIAR determined that with the proposed phased improvements, the proposed <br /> development will result in acceptable levels of service as defined by HCC §25-2-46. <br /> WHBP LLC will continue to comply with the TIAR's recommendations for improvements <br /> within the VVHBP project area as it proceeds with the development of the property, <br /> With respect to water. DWS has determined that there is sufficient water to support the <br /> deveiopment of the VVi- BP. fhese requirements were imposed as Condition G of <br /> Ordinance 04-110. <br /> With respect to a civil defense siren, Condition 12 of LUC Docket No. A00-013 requires <br /> the installation of a solar powered siren in a central location as determined by the <br /> County of Hawaii and State Civil Defense agencies. WHBP LLC will install the siren as <br /> required by these agencies. <br /> Based on the above, the existing project and proposed amendment is consi,tent with <br /> the Zoning Code Concurrency Requirements as contained in HCC §25-2-46, <br /> Consistency with original determinations by the Planning Department in <br /> recommending approval of Ordinance No. 04-110 <br /> In its review of the WHBP's change of Zone request in 2004, the Planning Department's <br /> staff report determined the following: <br /> 1. The request will not result in a substantial adverse impact upon the surrounding <br /> area. <br /> The project area is situated between two existing industrial areas, Kaloko <br /> Industrial Park to the north and Honokohau Industrial area to the south. The <br /> project area includes an existing quarry and related uses. The approval of the <br /> industrial zoning is consistent with the existing uses within the project site and <br /> surrounding areas. <br /> 2. All essential utilities are available to the site. <br /> Water, electrical, cable and telephone serve is available to the projec'r area. <br /> While no sewer service is currently available. However, until such a connection <br /> is prov'icled, tenants 1,"withiri VIVi"`IBP are required i i-ltiiize individual wastewater <br /> systems {WS} with an enhanced treatment system. Pursuant to the LUC <br />