My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 221 Draft 03 2020-2022
ClerkCouncil
>
Council Records
>
Bills
>
2020-2022
>
BIL 221 Draft 03 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 11:39:00 AM
Creation date
11/18/2022 9:25:20 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
221
Draft
03
Introducer
Ashley L. Kierkiewicz, Council Member
Referred To
PWMTC
Action 1
Council: Bill 221, Draft 3 passes first reading; adopts PWMTC-26 - 12/21/22
Action 2
Council: Bill 221, Draft 3 passes second & final reading - 1/5/23
Date To Mayor or Adoption Date
1/10/2023
Reading Number
1
Reading Date
12/21/2022
Ayes
9-Evans, Galimba, Inaba, Kagiwada, Kānealiʻi-Kleinfelder, Kierkiewicz, Kimball, Lee Loy, Villegas
Noes
0
Absent
0
Excused
0
Reading Number .
2
Reading Date .
1/5/2023
Ayes .
9-Evans, Galimba, Inaba, Kagiwada, Kānealiʻi-Kleinfelder, Kierkiewicz, Kimball, Lee Loy, Villegas
Noes .
0
Absent .
0
Excused .
0
Document Relationships
AGE COUNCIL 2022-12-21 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE COUNCIL 2023-01-05 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
COM 1029.009 2020-2022
(Related)
Path:
\Council Records\Communications\2020-2022
ORD 2023-008 2022-2024
(Related To)
Path:
\Council Records\Ordinances\2023
REP PWMTC 026 2022/11/15 2020-2022
(Related)
Path:
\Council Records\Reports\2020-2022\Public Works and Mass Transit Committee (PWMTC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) The piping shall be filled with twenty-five psi of air and held for <br /> fifteen minutes. No drop in pressure is allowed. <br /> (3) An air test need not be conducted when the piping is above ground and less <br /> than five feet in length. <br /> (4) Automatic fire sprinkler system without a fire department connection does <br /> not require an air test." <br /> [2018 HSFC: 57] <br /> "13.3.3.2.3 Inspection, Testing, and Maintenance Label. It shall be <br /> unlawful to inspect, test, or maintain any automatic fire sprinkler system <br /> without providing an approved label signifying successful testing of the system. <br /> (1) An approved inspection, testing, and maintenance label affixed to the fire <br /> department connection and the sprinkler riser. Automatic fire sprinkler <br /> systems that do not have a fire department connection shall have the label <br /> affixed to the riser. <br /> (2) The label shall indicate the type of system, month and year the system was <br /> tested; certificate of fitness holder's name and number; and company's <br /> name, address and contact information. <br /> (3) The label shall be clearly visible and punched with no more than one year <br /> and one month." <br /> [2018 HSFC: 57] <br /> "13.3.3.2.4 The fire department shall be verbally notified immediately of any <br /> system determined to be out of service. Systems that cannot be utilized for <br /> firefighting operations shall have an inoperable system sign affixed to the fire <br /> department connection. The sign shall remain in place until all repairs have <br /> been made and a satisfactory inspection, test, and maintenance system test is <br /> completed." [2018 HSFC: 57] <br /> "13.3.3.2.5 Inspection, Testing, and Maintenance Report. An inspection, <br /> testing, and maintenance report entitled"Automatic Sprinkler Systems" <br /> available on the State Fire Council's website and at each county fire <br /> department's fire prevention branch or a similar report approved by the AHJ, <br /> shall be provided to the property owner or agent within fourteen days after the <br /> test." [2018 HSFC: 57] <br /> "13.3.3.2.6 An electronic copy of the unsatisfactory report shall be submitted to <br /> the AHJ within five working days. Submittal of a satisfactory inspection, <br /> testing, and maintenance report will be determined by the AHJ." <br /> [2018 HSFC: 57] <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.