My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0698.000 2022-2024
ClerkCouncil
>
Council Records
>
Communications
>
2022-2024
>
COM 0698.000 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2024 3:58:52 PM
Creation date
1/29/2024 1:41:42 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2022-2024
Communication
0698
Point
000
Author
Susan K. Kunz, Housing Administrator
Communications - Referred To
LAAC
Document Relationships
AGE COUNCIL 2024-02-21 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE LAAC 2024/02/07 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
REP LAAC 051 2024-02-07 2022-2024
(Related)
Path:
\Council Records\Reports\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
RES 427 Draft 01 2022-2024
(Related To)
Path:
\Council Records\Resolutions\2022-2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roads <br />Existing: <br />There is an existing 60-ft right-of-way (Malulani Drive) that terminates at <br />the base of the project site. It is a two-way, two- to four-lane roadway <br />between Queen Kaahumanu Highway and its terminus at the project site. <br />The posted speed limit on Malulani Drive is 25 mph. <br />Planned: <br />Malulani Drive and 60-ft right-of-way will need to be extended approximat <br />1,500-1f to the project site. Continuous curb, gutter, and sidewalk are <br />proposed along the project side of the roadway extension, with the <br />opposite side consisting of a grassed shoulder and Swale. Three new <br />driveway aprons will provide access to the project site. The project traffic <br />impact assessment report recommends some minor improvements to the <br />existing Hale Kapili St. & Malulani Dr. intersection consisting mostly of <br />striping revisions no si nalization recommended). <br />Electrical <br />Existing: <br />Electrical is stubbed out on Malulani Drive. <br />Planned: <br />Electrical lines will be extended from Malulani Drive into the project site to <br />serve the project. <br />Gas <br />Existing: <br />Gas will not be used. <br />I <br />E <br />Planned: <br />None. <br />Form 201H-001, 03/29/2023 Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.