Laserfiche WebLink
Curtis Tyler <br />September 9, 2002 <br />Page 2 <br />6. The note to §3-12 says that a building with large windows could have several <br />hundred square feet of signage, but the limit is 25% of the total area or 150 square feet <br />whichever is greater. <br />7. For §3-14 "altered" and "reconstructed" should be defined. Do you want to <br />address issues such as painting or other maintenance? <br />8. Section 3-16 on illuminated signs should define "electrical inspector." The <br />note indicates that the inspector's action is advisory while the proposed ordinance <br />language says that the inspector approves or disapproves the application. Since the <br />inspector is actually making a recommendation of approval or disapproval the language <br />should state recommend approval or denial and then continue on to provide that the <br />application and the recommendation be returned to the director of public works for his <br />action. <br />9. Section 3-17(b) states that a permit is not transferable unless notice is filed <br />with the director within 90 days of transfer of premises. Generally permits which allow <br />certain uses on land such as building permits run with the land and are not personal to <br />the holder of the permit. What is the intended consequence if such notice is not filed? <br />If this section is to be retained a provision should be made specifying what will happen <br />if not complied with. <br />10. Division 6 transfers the variance function from the Planning Commission to <br />the council. This is a quasi-judicial function which is not generally a function exercised <br />by a legislative body. Is it your intention that an appeal to circuit court from the <br />council's decision on the variance request be allowed or provided for? Based upon the <br />case of Sandy Beach v. City Council of the City and County of the Honolulu, 70 Haw. <br />361, 77 3.P2d 250 (1989) which held that chapter 91 did not apply to the city council <br />when it acted upon an SMA permit, you probably would not need to follow the <br />procedural requirements contained within chapter 91 and applicable to administrative <br />hearings. However, you should be prepared for arguments on whether constitutional <br />property rights have been affected by the variance action and that therefore, an appeal <br />should be permitted. The standard for granting a variance might lend support to this <br />argument. <br />Under the present code, appeals from the planning commission's decision on a <br />variance request are taken to the Board of Appeals. Since the Board conducts a <br />contested case hearing, it's decision is then appealable to the circuit court. <br />